3F0126-01, Proof of Financial Protection

From kanterella
Jump to navigation Jump to search
Proof of Financial Protection
ML26015A513
Person / Time
Site: Crystal River  
Issue date: 01/15/2026
From: Reid B
ADP CR3
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
3F0126-01
Download: ML26015A513 (0)


Text

ADP CR3, LLC CR3 Decommissioning 15760 West Power Line Street l Crystal River, FL 34428 Billy Reid, Site Executive Cellphone: 865-384-6789 Email: breid@northstar.com 3F0126-01 10 CFR 140.15 January 15, 2026 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River 3 - Proof of Financial Protection Docket Numbers 50-302, 72-1035 Operating License Number DPR-72

Dear Sir or Madam,

In accordance with 10 CFR 140.15, ADP CR3, LLC hereby provides proof of financial protection in the form of nuclear energy liability insurance for the Crystal River Nuclear Generating Plant. ADP CR3, LLC maintains the existing nuclear liability coverage in accordance with the approved exemption to 10 CFR 140.11(a)(4).

The attached Certificate of Liability Insurance satisfies the requirement to provide proof of financial protection per the requirements of 10 CFR 140.15.

This letter contains no new regulatory commitments.

Should you have any questions regarding this submittal, please contact Mr. John T. Jernigan at (352) 342-0792.

Sincerely, Billy Reid Nuclear Executive

Attachment:

Certificate of Liability Insurance Cc: NMSS Project Manager Regional Administrator, Region 1

See Attached SEE ATTACHED Nuclear Energy Liability CN102429173-OTU--26-27 01/01/2027 ATL-004516345-33 10/27/2025 45 01/01/2026 Effective September 13, 2016 in accordance with the NRC approved changes to facility operating license, Duke Energy Progress, Inc. changed corporate form to Duke Energy Progress, LLC and insurance policies have been amended accordingly.

Attn: Lance Burnette Duke Energy Corporation 525 S. Tryon Street Lance.Burnette@duke-energy.com Charlotte, NC 28202 DEP16A American Nuclear Insurers 100 North Tryon Street, Suite 3600 MARSH USA LLC.

Charlotte, NC 28202 N

Washington, DC 20555-0001 Document Control Desk U.S. Nuclear Regulatory Commission A

MARSH USA LLC.

2. SITE #2 - MCGUIRE Types of Insurance: NF - [Facility Form], NW- [Master Worker Certificate], NS - [US Domestic Suppliers & Transporters], FS - [Foreign Suppliers & Transporters], N- [Secondary Financial Protection Certificate]

December 31st of the calendar year in which the Effective Date of this Certificate occurs, notice will be delivered in accordance with the policy provisions. Otherwise this Certificate shall terminate as of the end of named herein, with respect to the Nuclear Facility at the Location shown and/or with respect to the Insured's operations described herein. If such policy is cancelled or otherwise terminated prior to the end of such December 31st. A Certificate will NOT be issued for any subsequent calendar year unless requested in writing.

CERTIFICATE OF NUCLEAR ENERGY LIABILITY INSURANCE N-0054 08/01/1977 ***

POLICY NUMBER: POLICY EFFECTIVE: LIMIT OF LIABILITY:

NF-0281 12/01/1983 $500 Million

4. SITE #4 - BRUNSWICK LOCATION OF NUCLEAR FACILITY: Catawba Nuclear Power Plant in the NE portion of York County, SC NW-0615 05/01/1977 $500 Million**

COVERAGE FOR NUCLEAR FACILITIES:

NAMED INSURED [LISTED ON POLICY]: Duke Energy Carolinas, LLC

3. SITE #3 - OCONEE LOCATION OF NUCLEAR FACILITY: McGuire Nuclear Power Plant located 17 mi N/NW of Charlotte, NC N-0055 08/01/1977 ***

NW-0569 03/01/1970 $500 Million**

DEP16A NW-0637 12/01/1983 $500 Million**

LOCATION OF NUCLEAR FACILITY: Brunswick Nuclear Power Plant 2.5 MI N of Southport, NC NAMED INSURED [LISTED ON POLICY]: Duke Energy Carolinas, LLC N-0069 01/23/1981 ***

NF-0182 03/01/1970 $500 Million POLICY NUMBER: POLICY EFFECTIVE: LIMIT OF LIABILITY:

LOCATION OF NUCLEAR FACILITY: Oconee Nuclear Power Plant in Oconee County, South Carolina N-0097 07/18/1984 ***

N-0024 08/01/1977 ***

N-0092 03/03/1983 ***

NF-0218 10/25/1973 $500 Million N-0022 08/01/1977 ***

NAMED INSURED [LISTED ON POLICY]: Duke Energy Carolinas, LLC This is to certify that there is in force as of the effective date of this Certificate a Nuclear Energy Liability Insurance Policy issued by members of American Nuclear Insurers as indicated (Companies), to the Insured NW-0597 10/25/1973 $500 Million**

NAMED INSURED [LISTED ON POLICY]: Duke Energy Progress, LLC POLICY NUMBER: POLICY EFFECTIVE: LIMIT OF LIABILITY:

1. SITE #1 - CATAWBA Attn: Lance Burnette Duke Energy Corporation Lance.Burnette@duke-energy.com Charlotte, NC 28202 N-0106 12/01/1983 ***

525 S. Tryon Street N-0023 08/01/1977 ***

NF-0248 05/01/1977 $500 Million POLICY NUMBER: POLICY EFFECTIVE: LIMIT OF LIABILITY:

MARSH USA LLC.

7. SITE #7 - H. B. ROBINSON POLICY NUMBER: POLICY EFFECTIVE: LIMIT OF LIABILITY:

NAMED INSURED [LISTED ON POLICY]: Duke Energy Florida, LLC, ADP CR3, LLC and ADP SF1, LLC NW-0579 07/01/1971 $500 Million**

NF-0195 07/01/1971 $100 Million

      • Secondary Financial Protection Certificate - Financial protection available under an industry retrospective rating plan.
5. SITE #5 - CRYSTAL RIVER COMMENTS/NOTES:

POLICY NUMBER: POLICY EFFECTIVE: LIMIT OF LIABILITY:

The insurance afforded by the policy(ies) is subject to the exclusions, conditions and other provisions of the policy(ies). Neither this Certificate nor any contract or other document with respect to which it is issued shall

6. SITE #6 - SHEARON HARRIS NW-0567 10/15/1969 $500 Million**

NAMED INSURED [LISTED ON POLICY]: Duke Energy Progress, LLC

9. SITE #9 - LEE LOCATION OF NUCLEAR FACILITY: H.B. Robinson Nuclear Power Plant 5 MI WNW from Hartsville, SC DEP16A NF-0288 06/01/1984 $500 Million amend, extend or alter the coverage afforded by the policy. The Limit of Liability shown above may have been reduced by payment of claims or claims expenses.

LOCATION OF NUCLEAR FACILITY: Shearon Harris Nuclear Power Plant 20 MI SW of Raleigh, NC N-0021 08/01/1977 ***

NF-0355 01/01/2016 $1 Million POLICY NUMBER: POLICY EFFECTIVE: LIMIT OF LIABILITY:

LOCATION OF NUCLEAR FACILITY: Lee Nuclear Site 8.2 MI SE of Gaffney, SC NW-0642 06/01/1984 $500 Million**

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.

    • Master Worker Certificate - This limit is shared by all Certificates to the Master Worker Policy of which each Certificate is a part and is subject to all of the provisions of such Policy and Certificate having reference NAMED INSURED [LISTED ON POLICY]: Duke Energy Carolinas, LLC LOCATION OF NUCLEAR FACILITY: Crystal River Nuclear Power Plant 7.5 MI NW of Crystal River, Citrus County, FL thereto. Such limit may have been reduced by payment of claims or claims expenses.

NAMED INSURED [LISTED ON POLICY]: Duke Energy Progress, LLC Attn: Lance Burnette Duke Energy Corporation Lance.Burnette@duke-energy.com Charlotte, NC 28202 N-0112 10/24/1986 ***

525 S. Tryon Street NF-0180 10/15/1969 $500 Million POLICY NUMBER POLICY EFFECTIVE: LIMIT OF LIABILITY: