2CAN109305, Forwards Missing TS Page 3/4 10-3 to Be Included W/Proposed Pages of 930723 Submittal Requesting Allowance of Removal of Cycle Specific Parameters from ANO-2 TS Per GL 88-16
| ML20059A548 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/20/1993 |
| From: | Yelverton J ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20059A552 | List: |
| References | |
| 2CAN109305, GL-88-16, TAC-M87066, NUDOCS 9310260379 | |
| Download: ML20059A548 (2) | |
Text
'
7 -
Entergy operationa,Inc.
9 ENTERGY l*20 %
~ Tcf 501964 8B38 4
Jerry W. Yelverton Vec itadat DwaVxc kNO October 20,1993 2CAN109305 U. S. Nuclcar Regulatory Commission Document Control Desk Mail Station Pl-137 Washington, DC 20555 P
Subject:
Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Additional Information Concerning Technical Specification Change Request Per Generic Letter 88-16 (TAC 'No. M87066)
Gentlemen:
By letter dated July 22,1993 (2CAN079301), Entergy Operations submitted a proposed Arkansas Nuclear One Unit 2 (ANO-2) Technical Specification change request to allow removal of cycle specific parameters from the ANO-2 Technical Specifications per Generic Letter 88-16. Subsequent to the submittal it was discovered that a page was omitted from the proposed Technical Specifications. Please find attached the proposed page 3/410-2 to be included with the proposed pages of the July 22,1993, submittal. The no significant hazards consideration of the July 22,1993, submittal remains unchanged by this information. Should you have any further questions, please feel free to contact my staff.
t Very truly yours, hocP;/l[h
/
/
/ JWY/nbm Attachments 260060 00 y'l 9310260379 931020 D
PDR ADOCK 05000368 h !
P PDR Q
p U. S. NRC
. October 20,1993' t
2CAN109305 Page 2 q
cc:
Mr. James Li Milhoan I
Regional Administrator l
U. S. Nuclear Regulatory Commission Region IV t
611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector l
Arkansas Nuclear One - ANO-1 & 2 i
Number 1, Nuclear Plant Road RusselMlle, AR 72801 Mr. Roby B. Bevan, Jr.
i NRR Project Manager Region IV/ANO-1 U. S. Nuclear Regulatory Commission NRR Mail Stop 13-H-3 One White Flint North 11555 Rockville Pike
-i Rockville, MD 20852 i
Mr. Thomas W. Alexion
.i NRR Project Manager, Region IV/ANO-2 j
U. S. Nuclear Regulatory Commission NRR Mail Stop 13-H-3 One White Flint North 11555 Rockville Pike Rockville, MD 20852
.l I
i 1
,