2CAN098912, Submits Relief Requests from ASME Section XI Code Requirements Re ANO-2 First 10-yr Inservice Insp Scheduled on 890825

From kanterella
(Redirected from 2CAN098912)
Jump to navigation Jump to search
Submits Relief Requests from ASME Section XI Code Requirements Re ANO-2 First 10-yr Inservice Insp Scheduled on 890825
ML20247R411
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/22/1989
From: James Fisicaro
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2CAN098912, 2CAN98912, NUDOCS 8909290247
Download: ML20247R411 (3)


Text

PO b 1

L m,e Racn. AR 72203 Tel 501377 4DDD l

I

'1 September 22, 1989 2CAN098912 1

9. S. Nuclear Regulatory Commission Document Control Desk Mail Station P1-137 Washington, D. C.

20555

SUBJECT:

Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Additional Relief Requests for ANO-2 First 10-Year Inservice Inspection Gentlemen:

As discussed between Mr. Chet Poslusny and Mr. Don Lomax on September 22, 1989, during the upcoming ANO-2 refueling outage, outage 2R7, scheduled to begin on September 25, 1989, Arkansas Power & Light Company will be conducting Inservice Inspection activities in accordance with the ASME Section XI Code.

For ANO-2, the current applicable ASME Section XI Code, the 1974 Edition through Summer 1975 Addenda, section IWA-5210 requires for system and component hydrostatic tests that test pressure and temperature be maintained for e.t least four hours prior to the performance of examinations for leakage.

Later Code editions, including the ANO-1 current app'licable Code (i.e., the l

1980 Edition, Winter 1981 Addenda) and the 1986 Edition which will be the l

upgraded Code of record for AND-2 beginning March 1990, provide for a holding time of four hours for insulated systems and ten minutes for noninsulated systems for system hydrostatic tests [ reference section IWA-5213(d)].

Approximately 37 hydrostatic tests will be performed during 2R7.

A listing of the systems on which hydrostatic tests will be performed is attached.

For the systems or portions of the systems to be tested which may be currently uninsulated or which could become uninsulated during the course of the outage, AP&L requests relief from the current Code requirements such that tne later guidance of the Code could be applied and a ten minute holding time prior to examination for leakage be utilized.

8909290247 890922

(

PDR ADDCK 05000368

(

i G

PNU

We appreciate the staff's efforts in this regard and apologize for any inconvenience associated with this delayed request.

)

I Very truly yours, w 0 hen w James Fisicaro Manager, Licensing JJF:PLC:sgw cc:

Regional Administrator Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 INPO Records Center 1500 Circle 75 Parkway Atlanta, GA 30339-3064 l

d Attachment 2R7 Hydrostatic Test Plans

System Description

1.

Service Water (Loop II) 2.

Secondary 3.

NaOH Tank 1

4.

Refueling Water Tank i

5.

Safety Injection Tanks G.

Low Pressure Safety Injection 7.

Shutdown Cooling 8.

Regenerative Heat Exchanger 9.

H2/N2 Supply to Volume Control Tank

10. Recctor Coolant Pump Connections
11. Quench Tank
12. Fuel Pool Cooling i
13. Reactor Coolant Pump Cooling
14. Waste Gas
15. Containment Purge Supply
16. H2 Purge
17. Reactor Drain Tank
18. Boron Management
19. 2T-12A, Holdup Tank
20. 2T-12B, Holdup Tank
21. 2T-12C, Holdup Tank
22. 2T-12D, Holdup Tank
23. Reactor Coolant System Sample
24. Containment Sump Drain
25. Service Air
26. Integrated Leak Rate Test Sensing
27. Breathing Air
28. Containment Test
29. Fire Water
30. Quench Tank Sample
31. High Pressure Nitrogen
32. Low Pressure Nitrogen
33. Containment Purge Exhaust
34. Plant Heating
35. Chilled Water
36. Component Cooling
37. Spent Fuel Pool