0CAN061101, Day Response to NRC Bulletin 2011-01, Mitigating Strategies

From kanterella
Jump to navigation Jump to search

Day Response to NRC Bulletin 2011-01, Mitigating Strategies
ML111610449
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/10/2011
From: Schwarz C
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
0CAN061101, BL-11-001
Download: ML111610449 (4)


Text

0CAN061101 June 10, 2011 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6

Reference:

NRC Bulletin 2011-01: Mitigating Strategies, dated May 11, 2011 (0CNA051103)

Dear Sir or Madam:

On May 11, 2011, the NRC issued the referenced Bulletin 2011-01, and requested a written response within 30 days. Attached is Entergys 30-day written response for Arkansas Nuclear One.

In response to the events on September 11, 2001, and NRC requirements, Entergy developed preplanned strategies and implemented guidance to maintain or restore core cooling, containment, and spent fuel cooling capabilities under the circumstances associated with the loss of large areas of the plant due to fire or explosions. Following the events on March 11, 2011, at the Fukushima Daiichi Nuclear Power Station, Entergy took actions to ensure availability of these capabilities. The attached response reflects these actions.

There are no new commitments contained in this submittal. If you need any additional information, please contact Stephenie Pyle at 479.858.4704.

I declare under penalty of perjury that the foregoing is true and correct. Executed on June 10, 2011.

Sincerely, Original Signed by Christopher J. Schwarz CJS/nbm

Attachment:

30-Day Response to NRC Bulletin 2011-01 Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 479-858-3110 Christopher J. Schwarz Vice President, Operations Arkansas Nuclear One

0CAN061101 Page 2 of 2 cc:

Mr. Elmo Collins Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS O-8 B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852

Attachment to 0CAN061101 30-Day Response to NRC Bulletin 2011-01

Attachment to 0CAN061101 Page 1 of 1 30-Day Response to NRC Bulletin 2011-01 QUESTION 1: Is the equipment necessary to execute the mitigating strategies, as described in your submittals to the NRC, available and capable of performing its intended function?

RESPONSE: The strategies required by section B.5.b of the Interim Compensatory Measures Order EA-02-026 and implemented pursuant to a license condition were submitted to the NRC by References 1, 2, 3, 4, 5, and 6 and reviewed and approved by the NRC in Reference 7.

Entergy assessed the status of equipment necessary to execute the mitigating strategies as identified in the referenced letters. Based upon the assessment, the equipment is available and capable of performing its intended function.

QUESTION 2: Are the guidance and strategies implemented capable of being executed considering the current configuration of your facility and current staffing and skill levels of the staff?

RESPONSE: Entergy assessed the capability to execute the mitigating strategies as identified in the referenced letters. Based upon the assessment, the guidance and strategies are capable of being executed considering the current configuration of facility, staffing, and skill levels of the staff.

REFERENCES

1. Letter, Entergy to NRC, Response to NRC Guidance Regarding Mitigation Strategies, dated May 26, 2005 (0CAN050508)
2. Letter, Entergy to NRC, Mitigating Strategies Request for Additional Information, dated October 6, 2005 (0CAN100501)
3. Letter, Entergy to NRC, Response to Report of Inspection of Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5. Temporary Instruction 2515/164; NRC Inspection Report 05000313/2005014 and 05000368/2005014, dated February 24, 2006 (0CAN020604)
4. Letter, Entergy to NRC, Response Providing Information Regarding Implementation Details for the Phase 2 and 3 Mitigating Strategies, dated January 10, 2007 (0CAN010701)
5. Letter, Entergy to NRC, Additional Information Regarding Mitigation Strategies, dated March 29, 2007 (0CAN030702)
6. Letter, Entergy to NRC, Additional Information Regarding B.5.b Mitigation Strategies, dated June 15, 2007 (0CAN060702)
7. Letter, NRC to Entergy, Conforming License Amendment to Incorporate the Mitigation Strategies Required By Section B.5.b of Commission Order EA-02-026 (TAC Nos. MD4494 and MD4495), dated July 18, 2007 (0CNA070702)