05000483/FIN-2017404-02
Jump to navigation
Jump to search
Site: | Callaway |
---|---|
Report | IR 05000483/2017404 Section 3S01 |
Date counted | Jun 30, 2017 (2017Q2) |
Type: | NCV: |
cornerstone | Physical Protection |
Identified by: | NRC identified |
Inspection Procedure: | IP 71130.01 |
Violation of: | 10 CFR 73, PHYSICAL PROTECTION OF PLANTS AND MATERIALS |
CCA | H.13, Consistent Process |
INPO aspect | DM.1 |
' | |