05000456/FIN-2017008-01 | 2017Q4 | | Failure to Prevent Secondary Missiles Following a Postulated HELB |
05000456/FIN-2017008-02 | 2017Q4 | | Inadequate Blow Out Panel Design Control |
05000456/FIN-2017008-03 | 2017Q4 | | Failure to Properly Correct Errors in Design Analysis for Main Steam Line Break in Main Steam Tunnel |
05000456/FIN-2017008-04 | 2017Q4 | | Untimely Corrective Action for Secondary Missiles |
05000456/FIN-2017008-05 | 2017Q4 | | Inaccurate Analysis of Record |
05000457/FIN-2018002-01 | 2018Q2 | H.9 | Inadequate Detail in Maintenance Work Instructions Resulted in Failed Gearbox Oil Cooler Head Gasket and Inoperable 2B Auxiliary Feedwater Pump |
05000456/FIN-2018002-02 | 2018Q2 | H.3 | Work Instruction Error Results in Reactor Coolant System Pressure Transient |
05000456/FIN-2018002-03 | 2018Q2 | H.4 | Inadequate Test Activity Coordination Results in Unintended Valve Actuation and Reactor Coolant System Pressure Drop |
05000456/FIN-2018003-01 | 2018Q3 | H.7 | Inadequate Detail in Maintenance Procedure for Emergency Diesel Generator 2-Year Inspection Contributed to 1A Emergency Diesel GeneratorFuel Rack Binding |
05000456/FIN-2018003-02 | 2018Q3 | | Minor Violation |