| | | Reporting criterion |
|---|
| 05000455/LER-1991-001, Advises That LER 91-001-00 Will Not Be Used | Advises That LER 91-001-00 Will Not Be Used | |
| 05000454/LER-1991-001-10, :on 910312 & 13,voltage Transient Occurred When 345-kV Line 0624 Tripped Open,Causing Monitors to Go Into Interlock Mode & Resulting in Engineered Safeguards Actuations.Caused by Faults on Lines |
- on 910312 & 13,voltage Transient Occurred When 345-kV Line 0624 Tripped Open,Causing Monitors to Go Into Interlock Mode & Resulting in Engineered Safeguards Actuations.Caused by Faults on Lines
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(1) |
| 05000455/LER-1991-002-06, :on 910311,containment Emergency Hatch Surveillance Not Performed within 72 H After Test on Hatch. on 901111,Type B LLRT Not Performed within 72 H.Caused by Procedure Deficiency.Procedures Revised |
- on 910311,containment Emergency Hatch Surveillance Not Performed within 72 H After Test on Hatch. on 901111,Type B LLRT Not Performed within 72 H.Caused by Procedure Deficiency.Procedures Revised
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(1) |
| 05000455/LER-1991-002-04, :on 910311,discovered That Local Leak Rate Test on Containment Emergency Hatch Not Performed within TS Required Time of 72 H.On 901111,Type B Tests Not Performed within 72 H.Caused by Procedural Deficiency |
- on 910311,discovered That Local Leak Rate Test on Containment Emergency Hatch Not Performed within TS Required Time of 72 H.On 901111,Type B Tests Not Performed within 72 H.Caused by Procedural Deficiency
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(x) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(1) |
| 05000454/LER-1991-002-11, :on 910505,voltage Transient Occurred When Lines Momentarily Opened During Thunderstorm.Caused by Lightning from Storm.Undervoltage Setpoint for Radiation Monitors Previously Lowered |
- on 910505,voltage Transient Occurred When Lines Momentarily Opened During Thunderstorm.Caused by Lightning from Storm.Undervoltage Setpoint for Radiation Monitors Previously Lowered
| 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) |
| 05000455/LER-1991-003-11, :on 911026,experienced RCS Leak in Excess of TS Requirements.Caused by Failed Packing Associated w/2RC029C Valve.Packing on Subj Valve Replaced |
- on 911026,experienced RCS Leak in Excess of TS Requirements.Caused by Failed Packing Associated w/2RC029C Valve.Packing on Subj Valve Replaced
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(1) |
| 05000454/LER-1991-003-09, :on 910729,identified Errors in Scaling Which Could Prevent Over Temp Delta Temp (OTDT) from Initiating Reactor Trip.Caused by Deficiency in Design That Indicated How OTDT Setpoint Was to Be Scaled |
- on 910729,identified Errors in Scaling Which Could Prevent Over Temp Delta Temp (OTDT) from Initiating Reactor Trip.Caused by Deficiency in Design That Indicated How OTDT Setpoint Was to Be Scaled
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) |
| 05000454/LER-1991-004-12, :on 911016,Train B SI,1B DG & Several Other Pieces of Equipment Actuated.Caused by Cognitive Personnel Error.Procedures Will Be Revised & Addl Training Will Be Provided on Operation of Auto SI Block |
- on 911016,Train B SI,1B DG & Several Other Pieces of Equipment Actuated.Caused by Cognitive Personnel Error.Procedures Will Be Revised & Addl Training Will Be Provided on Operation of Auto SI Block
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) |
| 05000454/LER-1991-004-11, :on 911016,inadvertent Safety Injection (SI) Occurred While Resetting Status Light for Auto SI Blocked Following ESFAS Surveillance.Caused by Personnel Error. Signal Reset & Equipment Restored |
- on 911016,inadvertent Safety Injection (SI) Occurred While Resetting Status Light for Auto SI Blocked Following ESFAS Surveillance.Caused by Personnel Error. Signal Reset & Equipment Restored
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) |
| 05000455/LER-1991-004-13, :on 911030,spurious Train B Feedwater Isolation Signal Generated,Causing Tempering Line Flow Control & Downstream Isolation Valves to Close.Caused by Failure of Logic Card.Isolation Reset |
- on 911030,spurious Train B Feedwater Isolation Signal Generated,Causing Tempering Line Flow Control & Downstream Isolation Valves to Close.Caused by Failure of Logic Card.Isolation Reset
| 10 CFR 50.73(a)(1), Submit an LER 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) |
| 05000455/LER-1991-005-09, :on 911107,low-2 Steam Generator Level Received on Steam Generator 2A Which Initiated Reactor Trip. Caused by Difficulty in Controlling Westinghouse D-5 Steam Generator Level.Level Instrument Taps Moved |
- on 911107,low-2 Steam Generator Level Received on Steam Generator 2A Which Initiated Reactor Trip. Caused by Difficulty in Controlling Westinghouse D-5 Steam Generator Level.Level Instrument Taps Moved
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(4) |
| 05000454/LER-1991-005-08, :on 911027,Mode 4 Entered W/Containment Spray Sys & ECCS Recirculation Sump Isolation Valves Inoperable. Caused by Control Room Personnel Failure.Mode Change Checklists Will Be Revised |
- on 911027,Mode 4 Entered W/Containment Spray Sys & ECCS Recirculation Sump Isolation Valves Inoperable. Caused by Control Room Personnel Failure.Mode Change Checklists Will Be Revised
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) |
| 05000455/LER-1991-005-01, :on 900817,preoutage Mod Work Initiated W/O Proper Operability Review Due to Programmatic Deficiencies. Daily Const Work Authorization Sheet Formalized |
- on 900817,preoutage Mod Work Initiated W/O Proper Operability Review Due to Programmatic Deficiencies. Daily Const Work Authorization Sheet Formalized
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(1) |
| 05000454/LER-1991-006-10, :on 911114,determined That Testing of 4160 Volt ESF Bus Undervoltage Relay Circuits Inadequate.Caused by Inadequate Testing Procedures.Surveillance Procedures Will Be Revised |
- on 911114,determined That Testing of 4160 Volt ESF Bus Undervoltage Relay Circuits Inadequate.Caused by Inadequate Testing Procedures.Surveillance Procedures Will Be Revised
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) |