| | Q | CCA | Title |
|---|
| 05000454/FIN-2017009-01 | 2017Q2 | | Failure to Perform 10 CFR 50.59 Evaluation for UFSAR Change |
| 05000454/FIN-2017002-01 | 2017Q2 | H.11 | Failure to Verify Computer Software during a Transformer Replacement Modification |
| 05000454/FIN-2017007-01 | 2017Q3 | H.5 | Fai lure to Perform Maintenance in Accordance with Performance Centered Maintenance Template |
| 05000454/FIN-2017007-02 | 2017Q3 | P.4 | Failure to Promptly Identify Degraded Reactor Containment Fan Cooler Circuitry |
| 05000454/FIN-2017405-01 | 2017Q3 | H.1 | Security |
| 05000454/FIN-2017405-02 | 2017Q3 | H.14 | Security |
| 05000454/FIN-2017010-01 | 2017Q4 | | Failure to Prevent Secondary Missiles Following a Postulated HELB |
| 05000454/FIN-2017010-02 | 2017Q4 | | Inadequate Blow Out Panel Design Control |
| 05000454/FIN-2017010-03 | 2017Q4 | | Failure to Properly Correct Errors in Design Analysis for Main Steam Line Break in Main Steam Tunnel |
| 05000454/FIN-2017010-04 | 2017Q4 | | Untimely Corrective Action for Secondary Missiles |
| 05000454/FIN-2017010-05 | 2017Q4 | | Inaccurate Analysis of Record |
| 05000455/FIN-2017004-01 | 2017Q4 | H.12 | Fire Barrier Impaired without Authorization |