05000410/FIN-2009009-02
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Parallel Performance Indicator White Finding |
Description | The NRC identified a parallel White Performance Indicator (PI) inspection finding involving significant weaknesses identified in Constellations causal evaluation and corrective actions for a White Cooling Water Systems PI. In accordance with Inspection Procedure 95001 and NRC Inspection Manual Chapter 0305, Operating Reactor Assessment Program, a parallel PI inspection finding is assigned the same safety significance as the initiating PI. This parallel PI inspection finding provides for additional NRC review of Constellations actions to address the weaknesses identified in this report and to demonstrate appropriate progress in reversing the adverse trend in cooling water systems performance as evidenced by the White PI. This finding takes the color (White) of the PI. Constellation entered this parallel finding into its Corrective Action Program (Condition Report No. 2009-007201). |
Site: | Nine Mile Point |
---|---|
Report | IR 05000410/2009009 Section 4OA4 |
Date counted | Dec 31, 2009 (2009Q4) |
Type: | Finding: White |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 95001 |
Inspectors (proximate) | W Cook G Dentel J Brand |
INPO aspect | |
' | |
Finding - Nine Mile Point - IR 05000410/2009009 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Nine Mile Point) @ 2009Q4
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||