| Q | CCA | Title |
---|
05000382/FIN-2010005-05 | 2010Q4 | | Failure to Implement the Experience and Qualification Requirements of the Quality Assurance Program |
05000382/FIN-2010403-03 | 2010Q4 | H.14 | Security |
05000382/FIN-2010403-02 | 2010Q4 | H.9 | Security |
05000382/FIN-2010403-01 | 2010Q4 | H.8 | Security |
05000382/FIN-2010005-04 | 2010Q4 | H.13 | Failure to Conduct Timely Corrective Actions to Replace Degraded Diodes in Safety Related Inverters |
05000382/FIN-2010005-03 | 2010Q4 | | Leakage from the Reactor Coolant Pump Seals |
05000382/FIN-2010005-02 | 2010Q4 | | Removal of Radioactivity from the Steam Generators |
05000382/FIN-2010005-01 | 2010Q4 | | Foreign Material Exclusion Issue associated with the Condensate Storage Pool Gooseneck Vent |
05000382/FIN-2011002-01 | 2011Q1 | P.2 | Failure to follow Operability Determination Process for a Degraded and Non-Conforming condition Related to Reactor Coolant Pump N9000 Seals |
05000382/FIN-2011002-02 | 2011Q1 | H.5 | Control Room Envelope Preconditioning |
05000382/FIN-2011003-05 | 2011Q2 | | Loss of Reactor Coolant Inventory during the Assembly of Incore Instrumentation Flanges |
05000382/FIN-2011402-01 | 2011Q2 | | Security |
05000382/FIN-2011301-01 | 2011Q2 | | None |
05000382/FIN-2011003-04 | 2011Q2 | H.12 | Failure to Implement Work Order Instructions to Restore a Feedwater Heater Drain Valve |
05000382/FIN-2011003-03 | 2011Q2 | H.12 | Failure to Implement Written Procedures for Restoring a Time Delay Relay Associated with the A Output Breaker |
05000382/FIN-2011003-01 | 2011Q2 | P.5 | Failure to Evaluate and Adequately Monitor Activities Associated with the Internal Conditions of the Condensate and Refueling Water Storage Pool Structures |
05000382/FIN-2011003-02 | 2011Q2 | P.2 | Failure to Update the FSAR following Modifications to the Reactor Coolant Pump Vapor Seals |