05000369/FIN-2018410-02

From kanterella
Jump to navigation Jump to search
02
Site: McGuire Duke Energy icon.png
Report IR 05000369/2018410 Section 3S01
Date counted Jun 30, 2018 (2018Q2)
Type: NCV: Green
cornerstone Physical Protection
Identified by: NRC identified
Inspection Procedure: IP 71130.01
Violation of: 10 CFR 73, PHYSICAL PROTECTION OF PLANTS AND MATERIALS
INPO aspect
'