| Q | CCA | Title |
---|
05000346/FIN-2013005-01 | 2013Q4 | H.11 H.12 | Operator Failure to Follow Procedure Results in Service Water System Transient |
05000346/FIN-2013005-02 | 2013Q4 | H.5 | Emergency Diesel Generator No. 2 Rendered Unavailable By Scheduled Maintenance |
05000346/FIN-2013005-03 | 2013Q4 | | Failure to Maintain Written Procedures to Provide Quality Assurance for Effluent Monitoring |
05000346/FIN-2014002-01 | 2014Q1 | | Failure to Implement Fire Protection Plan Requirements Related to Control of Ignition Sources |
05000346/FIN-2014002-02 | 2014Q1 | P.3 | Containment ECCS Recirculation Sump Reliability Degraded Due to Unfastened Debris Gate |
05000346/FIN-2013009-01 | 2014Q1 | | Methodology and Acceptance Criteria Utilized for Design and Licensing Basis of the Shield Building with Laminar Cracking |
05000346/FIN-2014003-03 | 2014Q2 | H.12 | Failure to Ensure Auxiliary Feedwater Design Bases Were Correctly Translated into Design Documents and Procedures |
05000346/FIN-2014003-04 | 2014Q2 | | Acceptance Criteria for Emergency Core Cooling System Room Cooler Inspection Was Not Specified in Inspection Procedure |
05000346/FIN-2014003-05 | 2014Q2 | P.3 | Repair Work Priority Did Not Support Timely Corrective Action |
05000346/FIN-2014406-01 | 2014Q3 | P.5 | Security |
05000346/FIN-2013010-02 | 2014Q3 | P.2 | Use of Unqualified Procedure for Ultrasonic Examination of Shield Building Rebar |
05000346/FIN-2013010-03 | 2014Q3 | H.14 | Failure to Completely Repair Shield Building Concrete Voiding |
05000346/FIN-2014201-01 | 2014Q3 | H.9 | Security |
05000346/FIN-2014004-01 | 2014Q3 | H.14 | Failure to Properly Perform Required Fire Watch |
05000346/FIN-2014004-02 | 2014Q3 | H.7 | Failure to Make a Timely 8-Hour Event Report Per 10 CFR 50.72(b)(3)(xiii) |
05000346/FIN-2013010-01 | 2014Q3 | | 10 CFR 50.59 Safety Evaluation Not Performed for Calculated Component Damping |