05000304/LER-1980-017, Forwards LER 80-017/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 80-017/03L-0
ML19309H930
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 05/09/1980
From: Wandke N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19309H931 List:
References
NUDOCS 8005200675
Download: ML19309H930 (1)


LER-1980-017, Forwards LER 80-017/03L-0
Event date:
Report date:
3041980017R00 - NRC Website

text

'

8cosa oo 676 3yg O Commonwealth Edison Zion Generating Station Shiloh Blvd. & Lake Michigan Zion, Illinois 60099 Telephone 312/746-2084 May 9, 1980 Mr. James G. Keppler Regional Director Directorate of Regulatory Operations Region III U.S. Nuclear Regulatory Commission Glen Ellyn, Illinois 60137

Reference:

Zion Generating Station Docket No. 50-304/DPR-48 Technical Specification, Section 6.6.2

Dear Mr. Keppler:

Enclosed please find Reportable Occurrence Report No.

50-304/80-17 for Zion Generating Station.

This report is submitted to you in accordance with the re-quirements of the Technical Specifications, Section 6.6.2.b. (2),

which states that conditions leading to operation in a degraded mode permitted by a limiting condition for operation or plant shutdown required by a limiting condition for operation requires a 30 day written report.

Very truly yours,

aLdL__,

N. E. Wandke Superintendent Zion Station Enclosure: Reportable Occurrence Report No. 50-304/90-17 l

kMY f 2 1980