| Q | CCA | Title |
---|
05000289/FIN-2009002-01 | 2009Q1 | H.8 | Instrument Accuracy Not Verified prior to Performing Containment Penetration Local Leak Rate Testing |
05000289/FIN-2009002-02 | 2009Q1 | | Decay Heat River Water System Pump (DR-P-1B) Failed to Start |
05000289/FIN-2009006-02 | 2009Q2 | H.14 | Inadequate Decay Heat River Water Equipment |
05000289/FIN-2009006-01 | 2009Q2 | | Failure to Assess Seismic Qualification of Stop Logs |
05000289/FIN-2009006-03 | 2009Q2 | H.7 | Failure to Install Amptector Bypass Jumper for Load Center Breaker |
05000289/FIN-2009003-02 | 2009Q2 | P.5 P.2(b) | Deficient Inspections, Evaluation, and Remediation of Submerged Underground Electrical Cables |
05000289/FIN-2009003-01 | 2009Q2 | H.4 H.5 | Deficient Coordination of Work Activities Resulted in NR-P-1C Becoming Inoperable |
05000289/FIN-2009201-01 | 2009Q3 | P.2 | Security |
05000289/FIN-2009201-02 | 2009Q3 | | Security |
05000289/FIN-2009201-03 | 2009Q3 | | Security |
05000289/FIN-2009201-04 | 2009Q3 | | Security |
05000289/FIN-2009201-05 | 2009Q3 | | Security |