POWER AUTHORITY OF THE STATE OF NEW YORK INDIAN POINT NO. 3 NUCLEAR POWER PLANT P. O. DOX 215 OUCH AN AN. N. Y.10511 TELEPHONE: 914-739-8200 4N/j 4A March 12, 1979 IP-FWG-4302 Docket No. 50-286 License No. DPR-64 Boyce H. Grier, Director Office of Inspection and Enforcement Region 1 U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Mr. Grier:
The attached Licensee Event Report LER 79-001/03L-0 is hereby submitted in accordance with the requirements of Technical Specifi-cation 6.9.1.
This event is of the type define 6 in 6.9.1.8.
(b) of the Technical Specification. Three copies of this letter and attachment are enclosed as required.
~
Very truly yours, f
J.. Bayne
~
j esident Manager FWG/rbb cc:
Director of Nuclear Reactor Regulation Attn: William Mcdonald, Director (3 copies)
Office of Management Information & Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Office of Inspection and Enforcement (30 copies) c/o Distribution Services Branch, DDC, ADM U. S. Nuclear Regulatory Commission Washington, D. C. 20555 George T. Berry, Executive Director Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 Resident Inspector T. Rebelowski George Wilverding, NYO P. W. Lyon, NYO
_ 9 0 3 16 0 (> 99 t
James Davis (SRC), NY0
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000286/LER-1979-001, Forwards LER 79-001/03L-0 | Forwards LER 79-001/03L-0 | | | 05000286/LER-1979-001-03, /03L-0 on 790211:high Dew Point & Air Leakage on Breaker 2-6 Noted.To Preclude Breaker Damage,Breaker 2-6 Was Opened.Caused by Apparent Gasket Leak in Westinghouse C-A Breaker.Feeder & Breaker Repaired | /03L-0 on 790211:high Dew Point & Air Leakage on Breaker 2-6 Noted.To Preclude Breaker Damage,Breaker 2-6 Was Opened.Caused by Apparent Gasket Leak in Westinghouse C-A Breaker.Feeder & Breaker Repaired | | | 05000286/LER-1979-002-03, /03L-0 on 790205:at 100% Power,Increase in Gaseous Activity Was Observed.Caused by Leakage of No 32 Charging Pump Plunger.Plunger & Packing for Union Pump QX-300 Quintuplex Were Replaced & Unit Returned to Svc | /03L-0 on 790205:at 100% Power,Increase in Gaseous Activity Was Observed.Caused by Leakage of No 32 Charging Pump Plunger.Plunger & Packing for Union Pump QX-300 Quintuplex Were Replaced & Unit Returned to Svc | | | 05000286/LER-1979-002, Forwards LER 79-002/03L-0 | Forwards LER 79-002/03L-0 | | | 05000247/LER-1979-003-03, /03L-0 on 790120:during Normal Operation,Signal from One of Two Low Level Alarm Devices for Refueling Water Tank Became Erratic,Making Alarm Inoperable.Caused by Freezing of Sensing Line for Level Instrument Controller | /03L-0 on 790120:during Normal Operation,Signal from One of Two Low Level Alarm Devices for Refueling Water Tank Became Erratic,Making Alarm Inoperable.Caused by Freezing of Sensing Line for Level Instrument Controller | | | 05000247/LER-1979-003, Forwards LER 79-003/03L-0 & LER 79-004/03L-0 | Forwards LER 79-003/03L-0 & LER 79-004/03L-0 | | | 05000247/LER-1979-004-03, /03L-0 on 790126:during Normal Operation,Process Radiation Monitors R-11 & R-12 Became Inoperable Due to Seized Sample Pump.Caused by Seizure of Conde Dry Air Pump, Model 6SFCW,for Process Radiation Monitors R-11 & R-12 | /03L-0 on 790126:during Normal Operation,Process Radiation Monitors R-11 & R-12 Became Inoperable Due to Seized Sample Pump.Caused by Seizure of Conde Dry Air Pump, Model 6SFCW,for Process Radiation Monitors R-11 & R-12 | | | 05000286/LER-1979-006, Has Been Voided | Has Been Voided | | | 05000286/LER-1979-008-03, /03L-0:on 790803,while Operating at 75% Power,Svc Water Pump 36 Was Smoking at Shaft Packing Gland Area.Caused by Wearing of Line Shafts & Bearings Under Normal Loads.Svc Water Pump Was Replaced | /03L-0:on 790803,while Operating at 75% Power,Svc Water Pump 36 Was Smoking at Shaft Packing Gland Area.Caused by Wearing of Line Shafts & Bearings Under Normal Loads.Svc Water Pump Was Replaced | | | 05000286/LER-1979-008, Forwards LER 79-008/03L-0 | Forwards LER 79-008/03L-0 | | | 05000286/LER-1979-009, Has Been Voided | Has Been Voided | | | 05000247/LER-1979-022-03, /03L-0:on 790913,amount of Water in Condensate Storage Tank Was 60,000 Gallons Below Tech Spec Requirement. Caused by Efforts to Reduce High Sodium Concentration in Hot Well | /03L-0:on 790913,amount of Water in Condensate Storage Tank Was 60,000 Gallons Below Tech Spec Requirement. Caused by Efforts to Reduce High Sodium Concentration in Hot Well | | | 05000247/LER-1979-022, Forwards LER 79-022/03L-0 | Forwards LER 79-022/03L-0 | |
|