05000266/FIN-2018001-02
Jump to navigation
Jump to search
| Site: | Point Beach |
|---|---|
| Report | IR 05000266/2018001 Section 4OA3 |
| Date counted | Mar 31, 2018 (2018Q1) |
| Type: | NCV: Green |
| cornerstone | Barrier Integrity |
| Identified by: | Self-revealing |
| Inspection Procedure: | IP 71153 |
| Inspectors (proximate) | T Hartman K Barclay G Edwards M Holmberg J Cameron |
| Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion III, Design Control |
| INPO aspect | |
| ' | |