| Q | CCA | Title |
---|
05000259/FIN-2014005-02 | 2014Q4 | | Failure to Demonstrate Satisfactory Performance of the Automatic Depressurization System Air Accumulators |
05000259/FIN-2014005-01 | 2014Q4 | P.2 | Failure to Perform Required Continued Monitoring of a Degraded Condition |
05000259/FIN-2015001-02 | 2015Q1 | | Failure to Have Simulator Fidelity with D EDG Control Switch |
05000259/FIN-2015001-07 | 2015Q1 | | Inaccurate Assumptions used for Past Operability analysis of a Probable Maximum Flood |
05000296/FIN-2015001-06 | 2015Q1 | | Failure to Report Condition Prohibited by TS |
05000259/FIN-2015001-05 | 2015Q1 | | Failure to Update FSAR |
05000296/FIN-2015001-04 | 2015Q1 | P.1 | Failure to Satisfy TS LCO 3.6.1.3 |
05000259/FIN-2015001-03 | 2015Q1 | H.1 | Failure to Maintain an Operating Procedure Resulted in the D EDG EXceeding its Technical Specification Allowed Outage Time |
05000259/FIN-2015001-01 | 2015Q1 | H.11 | HPCI Venting Procedures |
05000259/FIN-2015405-01 | 2015Q2 | | Security |
05000296/FIN-2015002-01 | 2015Q2 | | Unit 3 HPCI Turbine Exhaust Drain High Level |
05000259/FIN-2015403-01 | 2015Q3 | | Security |
05000296/FIN-2015003-01 | 2015Q3 | P.2 | Failure to Promptly Identify a Condition Adverse to Quality Associated with HPCI Turbine Exhaust System |
05000259/FIN-2015404-03 | 2015Q3 | | Security |
05000259/FIN-2015404-02 | 2015Q3 | | Security |
05000259/FIN-2015404-01 | 2015Q3 | | Security |
05000259/FIN-2015406-01 | 2015Q3 | | Security |