Severity level (
SL) IV. The inspectors identified a
SL IV
NCV of
10 CFR 50.59, Changes, Tests, and Experiments for the licensees failure to perform a written evaluation prior to implementing a calculation change based on raising the acceptance criteria for back leakage from valves which leak containment activity. Specifically, the change of back leakage affected the post accident dose impact to control room operators and this was not evaluated in accordance with
10 CFR 50.59. The licensee entered the item into their corrective action program. After removing margin from other components, the licensee determined the change to acceptance criteria could be implemented without prior NRC approval. The inspectors concluded this finding was more than minor since it impacted the NRCs ability to perform its regulatory function and if left uncorrected would have raised the dose to control room operators above the level requiring NRC approval. The inspectors concluded the original calculation would have required prior NRC approval. The issue screened as
SL IV since the inspectors brought the issue to the attention of the licensee before plant start-up, so there was no actual impact with the plant at power. In addition, the issue was not repetitive or willful. Therefore, it was of very low safety significance. (Section 1R22)