| Q | CCA | Title |
---|
05000410/FIN-2016001-01 | 2016Q1 | H.5 | Inadequate Procedure Leading to Failure to Manage Elevated Risk during Preventive Maintenance |
05000410/FIN-2016001-02 | 2016Q1 | H.8 | 50.65(a)(4) Risk Evaluation Not Properly Performed Prior to Residual Heat Removal Heat Exchanger Testing |
05000220/FIN-2016001-03 | 2016Q1 | H.8 | Inadequate Tagout Resulting in Reactor Building Closed-Loop Cooling Drain Down Event |
05000410/FIN-2016002-01 | 2016Q2 | | Ineffective Corrective Action Results in Water Intrusion to Battery Switchgear Room |
05000410/FIN-2016002-02 | 2016Q2 | P.1 | Failure to Identify Wide Range Level Indication Impacts Operability of HPCS and RCIC |
05000410/FIN-2016002-03 | 2016Q2 | H.4 | Failure to Understand Radiological Conditions Results in Unintended Exposure |
05000220/FIN-2016403-01 | 2016Q2 | | Security |
05000220/FIN-2016404-01 | 2016Q4 | H.6 | Security |