05000389/FIN-2018003-01
Jump to navigation
Jump to search
Site: | Saint Lucie |
---|---|
Report | IR 05000389/2018003 Section 1R05 |
Date counted | Sep 30, 2018 (2018Q3) |
Type: | NCV: Green |
cornerstone | Initiating Events |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.05 |
Inspectors (proximate) | T Morrissey S Roberts R Carrion B Collins P Cooper R Musser |
Violation of: | 10 CFR 50.48 |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |