Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML22340A150 | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 1.0, Introduction and Summary |
AEP-NRC-2021-19, 0 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary |
AEP-NRC-2015-83, Revision 1 of Final Integrated Plan Regarding March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 1 October 2015 | Revision 1 of Final Integrated Plan Regarding March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
AEP-NRC-2015-22, Compliance with March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 16 June 2015 | Compliance with March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
AEP-NRC-2015-23, Final Integrated Plan Regarding March 12, 2012, U.S. NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 16 June 2015 | Final Integrated Plan Regarding March 12, 2012, U.S. NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
AEP-NRC-2015-03, License Amendment Request to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | 6 February 2015 | License Amendment Request to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability |
ML13357A325 | 10 January 2014 | Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Donald C. Cook Nuclear Plant, Units 1 and 2, TAC Nos.: MF0766 and MF0767 |
ML17326A121 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 2.With 990915 Ltr |
ML17326A120 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 1.With 990915 Ltr |
ML17326A101 | 26 August 1999 | LER 99-020-00:on 990727,EDGs Were Declared Inoperable.Caused by Inadequate Protection of Air Intake,Exhaust & Room Ventilation Structures from Tornado Missile Hazards. Implemented Compensatory Measures in Form of ACs |
ML17326A099 | 26 August 1999 | Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed |
ML17326A087 | 31 July 1999 | Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Unit 1.With 990812 Ltr |
ML17326A086 | 31 July 1999 | Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Units 2.With 990812 Ltr |
ML17335A168 | 31 March 1998 | Final TER on step-2 Review of IPEEE at DC Cook Nuclear Plant,Units 1 & 2, March 1998 |
ML17324A947 | 13 June 1986 | Informs of Removal of Automatic Trip on Low Suction Pressure in Auxiliary Feedwater (AFW) Sys.Trip Does Not Enhance Capability of AFW sys.Alarm/operator-action Will Replace Trip Function |