Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML22144A12418 May 20226 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis
ML21334A03322 November 20213 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis
ML20335A13323 November 20205 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis
ML20160A07320 May 20202 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis
ML18094A53612 April 2018Enforcement Discretion Per Egm 15-002
L-18-017, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado.15 March 2018Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado.
IR 05000334/201700326 October 2017Integrated Inspection Report 05000334/2017003 and 05000412/2017003
05000334/LER-2017-00213 September 20171 OF 4
LER 17-002-00 for Beaver Valley Power Station, Unit No. 1 Regarding Inadequate Emergency Diesel Generator (EOG) Tornado Missile Protection Identified Due to Non-conforming Design Conditions
ML17244A91221 April 2017Redacted - Beaver Valley Power Station, Unit 1, Revision 30 to Updated Final Safety Analysis Report, Section 2, Site
05000334/LER-2017-00118 April 2017Inadequate Tornado Missile Protection Identified Due to Non-Conforming Design Conditions
LER 17-001-00 for Beaver Valley Power Station, Unit Nos. 1 and 2 Regarding Inadequate Tornado Missile Protection Identified Due to Nonconforming Design Conditions
L-12-349, Report of Facility Changes, Tests and Experiments for Period October 29, 2010 Through September 24, 20123 December 2012Report of Facility Changes, Tests and Experiments for Period October 29, 2010 Through September 24, 2012
L-12-326, Response to a Request for Additional Information on a Proposed Emergency Preparedness Plan Revision28 September 2012Response to a Request for Additional Information on a Proposed Emergency Preparedness Plan Revision
L-08-269, Supplement Reply to Request for Additional Information for the Review of License Application and License Renewal Application Amendment No. 2222 August 2008Supplement Reply to Request for Additional Information for the Review of License Application and License Renewal Application Amendment No. 22
IR 05000334/19960078 November 1996Insp Repts 50-334/96-07 & 50-412/96-07 on 960813-0928. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support
ML20079C91814 June 1991Responds to NRC Re Main Feedwater Piping Elbow Cracking & Misalignment.Temp & Displacement Instrumentation Installed at Certain Locations on Main Feedwater Piping Loops a & C.Marked-up FSAR Encl
ML20132C47930 October 1984Forwards Auxiliary Sys Branch SER Input Re All FSAR Amends Up to & Including Amend 8.Areas Listed Unresolved & Require Addl Info.Resolution of Listed Concerns Will Be Reported in Sser.Salp Evaluation Also Encl
ML20132C33826 July 1984Forwards Structural & Geotechnical Engineering Branch SER Re FSAR
ML20009D93912 March 1981Second Issue of Criteria for Re-Evaluation of Concrete Masonry Walls for IE Bulletin 80-11.
ML20246P11911 October 1974SER of Beaver Valley Power Station Unit 1