Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML22144A124 | 18 May 2022 | 6 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis |
ML21334A033 | 22 November 2021 | 3 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis |
ML20335A133 | 23 November 2020 | 5 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis |
ML20160A073 | 20 May 2020 | 2 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis |
ML18094A536 | 12 April 2018 | Enforcement Discretion Per Egm 15-002 |
L-18-017, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado. | 15 March 2018 | Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado. |
IR 05000334/2017003 | 26 October 2017 | Integrated Inspection Report 05000334/2017003 and 05000412/2017003 |
05000334/LER-2017-002 | 13 September 2017 | 1 OF 4 LER 17-002-00 for Beaver Valley Power Station, Unit No. 1 Regarding Inadequate Emergency Diesel Generator (EOG) Tornado Missile Protection Identified Due to Non-conforming Design Conditions |
ML17244A912 | 21 April 2017 | Redacted - Beaver Valley Power Station, Unit 1, Revision 30 to Updated Final Safety Analysis Report, Section 2, Site |
05000334/LER-2017-001 | 18 April 2017 | Inadequate Tornado Missile Protection Identified Due to Non-Conforming Design Conditions LER 17-001-00 for Beaver Valley Power Station, Unit Nos. 1 and 2 Regarding Inadequate Tornado Missile Protection Identified Due to Nonconforming Design Conditions |
L-12-349, Report of Facility Changes, Tests and Experiments for Period October 29, 2010 Through September 24, 2012 | 3 December 2012 | Report of Facility Changes, Tests and Experiments for Period October 29, 2010 Through September 24, 2012 |
L-12-326, Response to a Request for Additional Information on a Proposed Emergency Preparedness Plan Revision | 28 September 2012 | Response to a Request for Additional Information on a Proposed Emergency Preparedness Plan Revision |
L-08-269, Supplement Reply to Request for Additional Information for the Review of License Application and License Renewal Application Amendment No. 22 | 22 August 2008 | Supplement Reply to Request for Additional Information for the Review of License Application and License Renewal Application Amendment No. 22 |
IR 05000334/1996007 | 8 November 1996 | Insp Repts 50-334/96-07 & 50-412/96-07 on 960813-0928. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support |
ML20079C918 | 14 June 1991 | Responds to NRC Re Main Feedwater Piping Elbow Cracking & Misalignment.Temp & Displacement Instrumentation Installed at Certain Locations on Main Feedwater Piping Loops a & C.Marked-up FSAR Encl |
ML20132C479 | 30 October 1984 | Forwards Auxiliary Sys Branch SER Input Re All FSAR Amends Up to & Including Amend 8.Areas Listed Unresolved & Require Addl Info.Resolution of Listed Concerns Will Be Reported in Sser.Salp Evaluation Also Encl |
ML20132C338 | 26 July 1984 | Forwards Structural & Geotechnical Engineering Branch SER Re FSAR |
ML20009D939 | 12 March 1981 | Second Issue of Criteria for Re-Evaluation of Concrete Masonry Walls for IE Bulletin 80-11. |
ML20246P119 | 11 October 1974 | SER of Beaver Valley Power Station Unit 1 |