Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML062360266 | 31 May 2006 | Independent Inspection Program for the Decommissioning of the Saxton Nuclear Reactor Final Report |
ML052140104 | 31 July 2005 | Final Status Survey Report for Saxton Nuclear Experimental Corp Containment Vessel Yard Excavation - Soil and Structural Remnants. |
E910-05-039, Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces Discharge Tunnel Transition Area SS23, SS25 | 31 July 2005 | Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces Discharge Tunnel Transition Area SS23, SS25 |
ML052090300 | 31 July 2005 | Appendix a Survey Design. |
E910-05-035, Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL7 | 22 July 2005 | Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL7 |
E900-05-027, Experimental Corporation Final Status Survey Report for OL6 and OL10, Snec Calculation Sheet | 14 July 2005 | Experimental Corporation Final Status Survey Report for OL6 and OL10, Snec Calculation Sheet |
E910-05-025, Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area Survery Units OL11-1 and OL11-2, Appendix a | 22 June 2005 | Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area Survery Units OL11-1 and OL11-2, Appendix a |
E910-05-024, Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL13. Appendix a | 22 June 2005 | Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL13. Appendix a |
E910-05-022, Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL4. Appendix a to Appendix E | 22 June 2005 | Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL4. Appendix a to Appendix E |
ML052140106 | 9 June 2005 | Rev 2 to Calculation E900-05-032, Open Land FSS Design - OL3 Paved Surfaces & Concrete, Appendices a - B to Final Status Survey Report for Saxton Nuclear Experimental Corporation 0L3 Paved Surfaces and Concrete. |
ML052140074 | 31 May 2005 | Rev 2 to Calculation E900-05-028, Open Land FSS Design - OL7 Paved Surfaces & Concrete, Appendices a & B to Final Status Survey Report for Saxton Nuclear Experimental Corporation OL7 Paved Surfaces and Concrete. |
E910-05-056, Rev. 0 to Calculation E900-05-024, Open Land FSS Design-OL3, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL3. | 27 May 2005 | Rev. 0 to Calculation E900-05-024, Open Land FSS Design-OL3, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL3. |
ML052140403 | 19 May 2005 | Rev. 1 to Calculation E900-05-015, OL1 Paved & Miscellaneous Concrete Surfaces MA8, PF1, DB5, DB1, SS12, SS24-Survey Design, Appendices B - D to Final Status Survey Report for Saxton Nuclear Experimental Corp Residual Concrete in OL1. |
ML052140053 | 10 May 2005 | Rev 0 to Calculation E900-05-014, Snec Plant Area Open Land - OL1 - Survey Design, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corp Open Land Area OL1. |
ML052140399 | 4 May 2005 | Rev. 0 to Calculation E900-05-015, OL1 Paved & Miscellaneous Concrete Surfaces MA8, PF1, DB5, DB1 - Survey Design, Appendex a to Final Status Survey Report for Saxton Nuclear Experimental Corp Residual Concrete in OL1. |
ML052140149 | 29 April 2005 | to Calculation E900-05-009, Westinghouse and Adjacent Areas Open Land - OL2 - Survey Design, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL2. |
ML052140153 | 29 April 2005 | to Calculation E900-05-011, Westinghouse and Adjacent Areas MA8-5 Concrete Survey Design, Appendix B to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL2. |
ML052140256 | 27 April 2005 | Rev. 0 to Calculation E900-05-015, OL1 Paved and Miscellaneous Concrete Surfaces MA8, PF1, DB5, Dbi - Survey Design, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Residual Macadam in OL1. |
E910-05-019, Calculation E900-05-012, Rev 0, Yard Storage Tank Excavation - OL1-7 - Survey Design, Appendix a, with Attachments to Final Status Survey Report for Saxton Nuclear Experimental Corporation East Yard Excavation OL1-7 | 22 April 2005 | Calculation E900-05-012, Rev 0, Yard Storage Tank Excavation - OL1-7 - Survey Design, Appendix a, with Attachments to Final Status Survey Report for Saxton Nuclear Experimental Corporation East Yard Excavation OL1-7 |
ML051950087 | 18 April 2005 | Calculation E900-05-023, Rev 0, Miscellaneous Chain Link MA9 - Survey Design. |
E910-05-029, Calculation E900-05-013, Rev. 0, Open Land FSS Design - OL8, Appendix a, with Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL8 | 29 March 2005 | Calculation E900-05-013, Rev. 0, Open Land FSS Design - OL8, Appendix a, with Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL8 |
E910-05-016, Calculation E900-05-018, Rev 0, Miscellaneous Area FSS Design - MA2, Appendix a with Attachments to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area MA2 | 24 March 2005 | Calculation E900-05-018, Rev 0, Miscellaneous Area FSS Design - MA2, Appendix a with Attachments to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area MA2 |
E910-05-046, Rev 0 to E900-04-017, Upper Spray Pump Area and Discharge Tunnel Entrance Survey Design, Appendix B & Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfa | 31 August 2004 | Rev 0 to E900-04-017, Upper Spray Pump Area and Discharge Tunnel Entrance Survey Design, Appendix B & Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces |
ML052090248 | 12 August 2004 | Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces Discharge Tunnel Transition Area SS23, SS25, Appendix B Snec Calculation Sheet |
ML052140136 | 2 August 2004 | Rev 0 to Calculation E900-03-032, Top of Seal Chamber 3 - Survey Design, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corp Saxton Steam Generating Station Structural Surfaces - Seal Chamber Roofs SS17 (1&2) & SS1 |
ML052140119 | 15 July 2004 | Rev 0 to Calculation E900-04-013, Cv Yard Survey Design - North East Side of Cv, Appendices a - D to Final Status Survey Report for Saxton Nuclear Experimental Corp Containment Vessel Yard Excavation - Soil and Structural Remnants. |
ML052140117 | 1 July 2004 | to Calculation E900-04-012, Cv Tunnel & Top of Seal Chambers 1 & 2 Survey Design, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces - Cv Steam Tunnel SS2 |
ML052140144 | 1 July 2004 | Rev 0 to Calculation E900-04-012, Cv Tunnel & Top of Seal Chambers 1 & 2 Survey Design, Appendix B to Final Status Survey Report for Saxton Nuclear Experimental Corp Saxton Steam Generating Station Structural Surfaces - Seal Chamber Roofs S |
ML052140065 | 13 May 2004 | Rev. 0 to Calculation E900-04-007, Discharge Tunnel Survey Design for Class 1 Areas, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corp Saxton Steam Generating Station Structural Surfaces -Discharge Tunnel SSI, SS |
ML052140120 | 16 April 2004 | to Calculation E900-04-004, Cv Tunnel Unistrut Survey Design, Appendix B to Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces - Cv Steam Tunnel SS22 |
ML040900350 | 29 February 2004 | to Saxton Nuclear Experimental Corporation Facility License Termination Plan. |
ML033250454 | 29 October 2003 | Experimental Corp, FSS Report for Snec Cv Interior Above 774 Elev and Exterior, Table of Contents and Report |
E910-03-031, FSS Report for Cv Interior, 774' Elev and Below, Revision 1 | 4 September 2003 | FSS Report for Cv Interior, 774' Elev and Below, Revision 1 |
E910-02-054, Experimental Corporation (Snec) Application for License Termination | 16 December 2002 | Experimental Corporation (Snec) Application for License Termination |
ML022750212 | 30 September 2002 | Experimental Corporation Facility License Termination Plan, Rev 1, Sections 3.0 - 8.0 |
IR 05000146/1998204 | 16 December 1998 | Insp Rept 50-146/98-204 on 981013-1106.No Violations Noted. Major Areas Inspected:Large Component Removal Project |
IR 05000146/1998203 | 13 October 1998 | Insp Rept 50-146/98-203 on 980914-17.No Violations Noted. Major Areas Inspected:Decommissioning Activities at Facility |
IR 05000146/1996001 | 21 January 1997 | Insp Rept 50-146/96-01 on 961119-21.No Violations Noted. Major Areas Inspected:Control & Monitoring of Asbestos, Control of Workplace Industrial Hazards & Conduct of Industrial Safety Program |
ML20086B856 | 31 December 1994 | Experimental Corp 1994 Annual Rept for Saxton Nuclear Experimental Facility for 940101-1231 |
ML20056G824 | 31 August 1993 | Penelec/Gpu Internal Affairs Dept Williamsburg Incident Investigation 89-WM-2 |
ML20101R264 | 31 March 1992 | Redacted Version of Penelec/Gpu Internal Affairs Dept Rept Williamsburg Incident Investigation 89-WM-2 |