Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML22292A070 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant |
ML21347A038 | 13 January 2022 | Issuance of Amendments to Revise Reactor Coolant Leakage Requirements |
RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | 4 January 2022 | Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements |
RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | 30 June 2021 | Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements |
NMP1L3401, (NMP) - Exelon Nuclear Radiological Emergency Plan Document Revisions | 13 May 2021 | (NMP) - Exelon Nuclear Radiological Emergency Plan Document Revisions |
ML21034A474 | 3 February 2021 | Handouts to Applicants (Folder 3) |
ML20170B021 | 23 June 2020 | NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections |
ML20034G546 | 12 March 2020 | Issuance of Amendments Revising Instrument Testing and Calibration Definitions |
RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | 25 June 2019 | Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program |
ML18073A364 | 28 March 2018 | Issuance of Amendment No. 168 to Revise Technical Specifications to Adopt TS Traveler Force 542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC No. MF9357; EPID L-2017-LLA-0178) |
ML18052A491 | 14 February 2018 | Radiological Emergency Plan Annex and Addendum Revisions |
ML17227A200 | 9 August 2017 | Radiological Emergency Plan Addendum Revisions; EP-AA-1013, Add. 3, Rev. 3 and EP-AA-1013, Add. 4, Rev. 2 |
ML17158B259 | 30 May 2017 | Attachment 3 - EP-AA-1013, Addendum 4, Revision 1, Nine Mile Point Nuclear Station Unit 2 Emergency Classification Technical Bases. |
ML17158B258 | 30 May 2017 | Attachment 2 - EP-AA-1013, Addendum 3, Revision 2, Nine Mile Point Nuclear Station Unit 1 Emergency Classification Technical Bases. |
ML17073A067 | 26 May 2017 | Issuance of Amendments Revising the Technical Specification Requirements for the Inservice Testing Program (CAC Nos. MF8238 - MF8256) |
NMP2L2640, License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 | 28 February 2017 | License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 |
ML17009A141 | 31 January 2017 | Se Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 (CAC Nos. MF1129, MF1130, MF1131, and MF1132) |
RS-16-245, Radiological Emergency Plan Revisions | 9 December 2016 | Radiological Emergency Plan Revisions |
ML16280A402 | 6 October 2016 | License Amendment Request - Supplement Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. |
ML16209A218 | 26 July 2016 | Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. |
ML16188A271 | 1 July 2016 | Final Integrated Plan Document- Mitigating Strategies NRC Order EA-12-049 |
ML15317A307 | 30 November 2015 | Issuance of Amendment Adoption of Technical Specification Task Force Traveler 425 |
RS-15-117, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 8 June 2015 | Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
NMP2L2562, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) | 19 November 2014 | Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) |
ML14057A554 | 29 May 2014 | Issuance of Amendment Regarding Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report |
ML13225A584 | 19 December 2013 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) |
ML13338A663 | 11 December 2013 | Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Nine Mile Point, Unit 1, TAC No.: MF1129 |
ML13074A056 | 8 March 2013 | Supplement to Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events |
ML13066A171 | 28 February 2013 | R.E. Gina, Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events |
ML12045A242 | 13 January 2012 | Response to NRC Request for Additional Information Regarding the Proposed Change to the Emergency Action Level Scheme, Attachment 1 |
ML12045A255 | 13 January 2012 | Updated Revision to Nine Mile Point, Units 1 & 2 - Emergency Action Levels, Attachments 4 and 5 |
ML113300038 | 30 November 2011 | Issuance of Amendment Regarding Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3 |
ML11130A149 | 6 May 2011 | Draft a Rev. 00 to Emergency Plan Maintenance Procedure, EPMP-EPP-0102, Unit 2 Emergency Classification Technical Bases. |
ML091980454 | 3 August 2009 | Request to Utilize Alternative of Applying ASME Code Case 730 for Repair and ISI of Control Rod Drive Bottom Head Penetrations for the License Renewal Period of Extended Operation |
ML081820317 | 27 February 2008 | Technical Specifications, Implementation of Arts/Mella |
ML070950197 | 30 March 2007 | License Amendment Request Pursuant to 10 CFR 50.90: Implementation of Arts/Mellla |
ML022100505 | 4 June 2002 | 5 to EPMP-EPP-0101, Nine Mile Point, Unit 1 Emergency Classification Technical Bases |
ML022100507 | 4 June 2002 | 6 to EPMP-EPP-0102, Nine Mile Point, Unit 2 Emergency Classification Technical Bases |
ML20211P593 | 10 September 1999 | Marked-up Tech Specs Pages Reflecting Conforming Administrative License Amend Associated with Proposed Transfer of Facilities to Amergen Energy Co,Llc |
ML18041A068 | 12 January 1999 | Forwards Revised Listed EPIPs & Rev 37 to Nine Mile Point Site Emergency Plan. Changes Are Submitted,Per 10CFR50,App E,Section V |
Information Notice 1998-13, Post-Refueling Outage Reactor Pressure Vessel Leak Testing Before Core Criticality | 20 April 1998 | Post-Refueling Outage Reactor Pressure Vessel Leak Testing Before Core Criticality |
ML20116M301 | 8 August 1996 | Provides Supplemental Info to Relief Requests Submitted in Ltr Dtd 960318,in Response to Matter Discussed W/Staff During Recent Telcon |
NRC Generic Letter 1995-10 | 15 December 1995 | NRC Generic Letter 1995-010: Relocation of Selected Technical Specifications Requirements Related to Instrumentation |
ML18041A029 | 6 July 1994 | Forwards Emergency Action Level Verification & Validation Rept. |
ML17059A353 | 10 June 1994 | Ny State EAL Upgrade Project Nine Mile Point Unit 1 EAL Generation Package. |
ML17059A355 | 10 June 1994 | Eals. |
ML17311A018 | 13 May 1994 | New York State EAL Upgrade Project Verification & Validation Rept. |
ML17059A283 | 28 April 1994 | Forwards Rev 6 to USAR for Nine Mile Point Nuclear Station Unit 2.Rev Limited to Editorial Changes & Does Not Update or Change Substantive Info Previously Described in Usar.Next Annual Rev Will Be Submitted in Oct 1994 |
ML20044F304 | 19 May 1993 | Proposed Tech Specs Sections 3.4.3.1 & 3.4.3.2 Re Generic Ltr 88-01,drywell Leak Detection Requirements |
ML20126H994 | 30 December 1992 | Proposed Tech Specs 3.4.3.1 & 3.4.3.2 Re RCS Leakage Detection Sys & Operational Leakage to Conform W/ Recommendations of Generic Ltr 88-01 |