Issue date | Title | |
---|---|---|
IR 05000272/2022004 | 31 January 2023 | Integrated Inspection Report 05000272/2022004 and 05000311/2022004 |
ML18318A266 | 19 December 2018 | Issuance of Amendment Nos. 325 and 306 Revise TS Reactor Trip System Instrumentation and Engineered Safety Features Actuation System Instrumentation Test Times and Completion Times |
LR-N18-0070, Response to Request for Additional Information (Rai), Implementation of WCAP-14333 and WCAP~15376 Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation System Instrumentation Test Times and .. | 17 July 2018 | Response to Request for Additional Information (Rai), Implementation of WCAP-14333 and WCAP~15376 Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation System Instrumentation Test Times and ... |
ML18171A321 | 20 June 2018 | NRR E-mail Capture - Final RAI: Revise Technical Specifications to Adopt TSTF-411 and 418 (L-2017-LLA-0442) |
LR-N17-0263, Response to Request for Additional Information, Salem Units 1 and 2 - Containment Fan Coil Unit Allowed Outage Time Extension Amendment Request | 14 September 2017 | Response to Request for Additional Information, Salem Units 1 and 2 - Containment Fan Coil Unit Allowed Outage Time Extension Amendment Request |
LR-N16-0173, License Amendment Request: Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) Extension | 6 March 2017 | License Amendment Request: Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) Extension |
ML16280A523 | 31 August 2016 | Technical Evaluation Report Salem Generating Station Storm Surge Hazard Reevaluation Review |
ML14113A221 | 30 April 2014 | NRC Staff Review of the Documentation Provided by PSEG Nuclear LLC for the Salem Generating Station Units 1 and 2 Concerning Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design |
LR-N14-0042, SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-99 Through End | 7 March 2014 | SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-99 Through End |
IR 05000272/2012003 | 10 August 2012 | IR 05000272-12-003, 05000311-12-003; 04/01/2012 - 06/30/2012; Salem Nuclear Generating Station Units 1 and 2; Maintenance Effectiveness and Operability Determinations and Functionality Assessments |
ML12129A389 | 27 April 2012 | Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-02 |
ML12129A390 | 27 April 2012 | Attachments 1 Through Attachment 8, Response to Generic Letter 2004-02 |
LR-N12-0124, Salem Generating Station, Units 1 and 2 - Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-02 | 27 April 2012 | Salem Generating Station, Units 1 and 2 - Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-02 |
LR-N11-0213, Inservice Inspection (Lsi) Program Plan, Fourth Ten-Year Interval | 11 August 2011 | Inservice Inspection (Lsi) Program Plan, Fourth Ten-Year Interval |
ML110410691 | 21 March 2011 | License Amendment, Issuance of Amendments Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program Based on Technical Specification Task Force (TSTF) Change TSTF-425 |
LR-N11-0039, Response to Draft Request for Additional Information - Risk-Informed Relocation of Surveillance Frequency Requirements | 31 January 2011 | Response to Draft Request for Additional Information - Risk-Informed Relocation of Surveillance Frequency Requirements |
ML103540481 | 20 December 2010 | Draft Request for Additional Information |
LR-N10-0380, Request for Authorization to Continue Using a Risk-Informed Inservice Inspection Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements for Class 1 and 2 Piping | 21 October 2010 | Request for Authorization to Continue Using a Risk-Informed Inservice Inspection Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements for Class 1 and 2 Piping |
LR-N10-0309, Supplement to RAI Responses Submitted in PSEG Letter LR-N10-0164 Dated May 24, 2010, Related to the Severe Accident Mitigation Alternatives (SAMA) | 18 August 2010 | Supplement to RAI Responses Submitted in PSEG Letter LR-N10-0164 Dated May 24, 2010, Related to the Severe Accident Mitigation Alternatives (SAMA) |
ML101540137 | 27 May 2010 | Draft Salem, Units 1 and 2, Updated Supplemental Response to Generic Letter 2004-02 |
LR-N10-0164, Response to NRC Request for Additional Information Dated April 12, 2010, Related to the Severe Accident Mitigation Alternatives Review | 24 May 2010 | Response to NRC Request for Additional Information Dated April 12, 2010, Related to the Severe Accident Mitigation Alternatives Review |
LR-N10-0088, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program | 23 March 2010 | Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program |
LR-N10-0055, Response to Request for Additional Information Regarding License Amendment Request for One-Time Extension of the Type a Test Interval | 24 February 2010 | Response to Request for Additional Information Regarding License Amendment Request for One-Time Extension of the Type a Test Interval |
LR-N09-0214, Stations, Unit 1 - License Amendment Request for One-Time Extension of the Type a Test Interval | 21 September 2009 | Stations, Unit 1 - License Amendment Request for One-Time Extension of the Type a Test Interval |
IR 05000272/2009003 | 12 August 2009 | IR 05000272-09-003, 05000311-09-003 on 04/01/09 - 06/30/09 for Salem, Units 1 and 2, Maintenance Effectiveness, Operability Evaluations |
LR-N09-0072, Updated Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | 31 March 2009 | Updated Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
ML083300079 | 17 December 2008 | Request for Additional Information Regarding Generic Letter 2004-02 |
ML082170506 | 12 August 2008 | Report on Results of Staff Audit of Corrective Actions to Address Generic Letter 2004-02 |
LR-N08-0043, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. | 29 February 2008 | Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. |
IR 05000272/2007005 | 7 February 2008 | IR 05000272-07-005, 05000311-07-005, on 10/01/2007 - 12/31/2007, Salem Nuclear Generating Station Units 1 and 2; Maintenance Effectiveness |
ML072950275 | 24 October 2007 | Draft Open Items from Staff Audit of Corrective Actions to Address Generic Letter 2004-02 |
IR 05000272/2006005 | 1 February 2007 | IR 05000272-06-005, 05000311-06-005; 10/01/2006 - 12/31/2006; Salem Generating Station Units 1 and 2; Equipment Alignment, Inservice Inspection, Refueling and Outage |
IR 05000275/2006012 | 8 September 2006 | Second Errata for Diablo Canyon Power Plant - NRC Problem Identification and Resolution Inspection Report 05000275-06-012 and 05000323-06-012 |
ML060380101 | 9 February 2006 | Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors |
LR-N05-0401, Response to Generic Letter 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | 1 September 2005 | Response to Generic Letter 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
ML061790624 | 2 March 2004 | OI Interview Transcript of Witness |
ML023380536 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010) |
ML023330457 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010) |
IR 05000272/2002006 | 2 August 2002 | IR 05000272-02-006, IR 05000311-02-006, on 05/12 - 06/29/02, Public Service Electric Gas Nuclear LLC, Salem Units1 and 2, Maintenance Rule Implementation, Identification and Resolution of Problems and Performance Indicator Verification |
ML18107A315 | 30 April 1999 | Submittal-Only Screening Review of Salem Generating Station Individual Plant Exam for External Events (Seismic Portion), Rev 1 |
ML18106A883 | 21 September 1998 | Forwards Response to 980803 RAI Re Proposed Amend to Modify TS 3/4 7.7, Auxiliary Building Exhaust Air Filtration Sys. |
ML18101B286 | 31 August 1995 | Technical Evaluation Rept of Plant IPE Front End Analysis. |