 Issue dateTitle
IR 05000272/202200431 January 2023Integrated Inspection Report 05000272/2022004 and 05000311/2022004
ML18318A26619 December 2018Issuance of Amendment Nos. 325 and 306 Revise TS Reactor Trip System Instrumentation and Engineered Safety Features Actuation System Instrumentation Test Times and Completion Times
LR-N18-0070, Response to Request for Additional Information (Rai), Implementation of WCAP-14333 and WCAP~15376 Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation System Instrumentation Test Times and ..17 July 2018Response to Request for Additional Information (Rai), Implementation of WCAP-14333 and WCAP~15376 Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation System Instrumentation Test Times and ...
ML18171A32120 June 2018NRR E-mail Capture - Final RAI: Revise Technical Specifications to Adopt TSTF-411 and 418 (L-2017-LLA-0442)
LR-N17-0263, Response to Request for Additional Information, Salem Units 1 and 2 - Containment Fan Coil Unit Allowed Outage Time Extension Amendment Request14 September 2017Response to Request for Additional Information, Salem Units 1 and 2 - Containment Fan Coil Unit Allowed Outage Time Extension Amendment Request
LR-N16-0173, License Amendment Request: Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) Extension6 March 2017License Amendment Request: Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) Extension
ML16280A52331 August 2016Technical Evaluation Report Salem Generating Station Storm Surge Hazard Reevaluation Review
ML14113A22130 April 2014NRC Staff Review of the Documentation Provided by PSEG Nuclear LLC for the Salem Generating Station Units 1 and 2 Concerning Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design
LR-N14-0042, SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-99 Through End7 March 2014SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-99 Through End
IR 05000272/201200310 August 2012IR 05000272-12-003, 05000311-12-003; 04/01/2012 - 06/30/2012; Salem Nuclear Generating Station Units 1 and 2; Maintenance Effectiveness and Operability Determinations and Functionality Assessments
ML12129A38927 April 2012Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-02
ML12129A39027 April 2012Attachments 1 Through Attachment 8, Response to Generic Letter 2004-02
LR-N12-0124, Salem Generating Station, Units 1 and 2 - Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-0227 April 2012Salem Generating Station, Units 1 and 2 - Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-02
LR-N11-0213, Inservice Inspection (Lsi) Program Plan, Fourth Ten-Year Interval11 August 2011Inservice Inspection (Lsi) Program Plan, Fourth Ten-Year Interval
ML11041069121 March 2011License Amendment, Issuance of Amendments Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program Based on Technical Specification Task Force (TSTF) Change TSTF-425
LR-N11-0039, Response to Draft Request for Additional Information - Risk-Informed Relocation of Surveillance Frequency Requirements31 January 2011Response to Draft Request for Additional Information - Risk-Informed Relocation of Surveillance Frequency Requirements
ML10354048120 December 2010Draft Request for Additional Information
LR-N10-0380, Request for Authorization to Continue Using a Risk-Informed Inservice Inspection Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements for Class 1 and 2 Piping21 October 2010Request for Authorization to Continue Using a Risk-Informed Inservice Inspection Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements for Class 1 and 2 Piping
LR-N10-0309, Supplement to RAI Responses Submitted in PSEG Letter LR-N10-0164 Dated May 24, 2010, Related to the Severe Accident Mitigation Alternatives (SAMA)18 August 2010Supplement to RAI Responses Submitted in PSEG Letter LR-N10-0164 Dated May 24, 2010, Related to the Severe Accident Mitigation Alternatives (SAMA)
ML10154013727 May 2010Draft Salem, Units 1 and 2, Updated Supplemental Response to Generic Letter 2004-02
LR-N10-0164, Response to NRC Request for Additional Information Dated April 12, 2010, Related to the Severe Accident Mitigation Alternatives Review24 May 2010Response to NRC Request for Additional Information Dated April 12, 2010, Related to the Severe Accident Mitigation Alternatives Review
LR-N10-0088, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program23 March 2010Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program
LR-N10-0055, Response to Request for Additional Information Regarding License Amendment Request for One-Time Extension of the Type a Test Interval24 February 2010Response to Request for Additional Information Regarding License Amendment Request for One-Time Extension of the Type a Test Interval
LR-N09-0214, Stations, Unit 1 - License Amendment Request for One-Time Extension of the Type a Test Interval21 September 2009Stations, Unit 1 - License Amendment Request for One-Time Extension of the Type a Test Interval
IR 05000272/200900312 August 2009IR 05000272-09-003, 05000311-09-003 on 04/01/09 - 06/30/09 for Salem, Units 1 and 2, Maintenance Effectiveness, Operability Evaluations
LR-N09-0072, Updated Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors31 March 2009Updated Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
ML08330007917 December 2008Request for Additional Information Regarding Generic Letter 2004-02
ML08217050612 August 2008Report on Results of Staff Audit of Corrective Actions to Address Generic Letter 2004-02
LR-N08-0043, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.29 February 2008Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.
IR 05000272/20070057 February 2008IR 05000272-07-005, 05000311-07-005, on 10/01/2007 - 12/31/2007, Salem Nuclear Generating Station Units 1 and 2; Maintenance Effectiveness
ML07295027524 October 2007Draft Open Items from Staff Audit of Corrective Actions to Address Generic Letter 2004-02
IR 05000272/20060051 February 2007IR 05000272-06-005, 05000311-06-005; 10/01/2006 - 12/31/2006; Salem Generating Station Units 1 and 2; Equipment Alignment, Inservice Inspection, Refueling and Outage
IR 05000275/20060128 September 2006Second Errata for Diablo Canyon Power Plant - NRC Problem Identification and Resolution Inspection Report 05000275-06-012 and 05000323-06-012
ML0603801019 February 2006Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors
LR-N05-0401, Response to Generic Letter 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors1 September 2005Response to Generic Letter 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
ML0617906242 March 2004OI Interview Transcript of Witness
ML02338053627 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010)
ML02333045727 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010)
IR 05000272/20020062 August 2002IR 05000272-02-006, IR 05000311-02-006, on 05/12 - 06/29/02, Public Service Electric Gas Nuclear LLC, Salem Units1 and 2, Maintenance Rule Implementation, Identification and Resolution of Problems and Performance Indicator Verification
ML18107A31530 April 1999Submittal-Only Screening Review of Salem Generating Station Individual Plant Exam for External Events (Seismic Portion), Rev 1
ML18106A88321 September 1998Forwards Response to 980803 RAI Re Proposed Amend to Modify TS 3/4 7.7, Auxiliary Building Exhaust Air Filtration Sys.
ML18101B28631 August 1995Technical Evaluation Rept of Plant IPE Front End Analysis.