 Issue dateTitle
IR 05000305/20120045 November 2012IR 05000305-12-004, 07/01/12 - 09/30/2012, Kewaunee Power Station NRC Integrated Inspection Report
IR 05000305/201200210 May 2012IR 05000305-12-002, on 01/01/2012 - 03/31/2012, Kewaunee Power Station (Kps); Post-Maintenance Testing; Surveillance Testing; and Follow-Up of Events and Notices of Enforcement Discretion
ML12033A01030 January 2012NRR E-mail Capture - ME7110 Kewaunee Amendment Request Chi-over-Q - Rsxb Request for Additional Information (RAI)
ML1025714467 September 2010Holistic Overview of GSI-191 Resolution for Kewaunee Power Station
ML10237128218 August 2010Enclosure (8 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3)
ML1018902342 June 2010Enclosure - Q&A to Attachment 1 Volume 05 (Section 3.0) - Kewaunee ITS Conversion Database
ML10140050719 May 2010E-mail Handouts for the 5/20/2010 Kewaunee Public Meeting
ML10125014626 April 20102009 Annual Environmental Monitoring Report
ML09287021114 October 2009Revised Questions 4, 6, 7, and 12 of Formal RAI Dated 08/14/2009 GL 2004-02
ML09260001815 September 2009Handout 1 - GSI-191 Resolution for Kewaunee Power Station
ML09204000614 August 2009RAI, Regarding Response to Generic Letter 2004-02 (Tac No. MC4691)
IR 05000305/20090035 August 2009IR 05000305-09-003, on 04/01/2009 - 06/30/2009, Kewaunee Power Station, Operability Evaluations, Component Design Bases Inspection, Surveillance Testing; and Follow Up of Events and Notices of Enforcement Discretion
ML09215089628 July 2009Response to Follow-up Question Regarding Severe Accident Mitigation Alternatives (SAMA)
ML09174064922 June 2009Draft RAI on Generic Letter 2004-02 Re. Potential Impact of Debris Blockage of PWR Sumps
IR 05000305/20090028 May 2009IR 05000305-09-002, on 01/01/2009 - 03/31/2009; Kewaunee Power Station, Flooding, Maintenance Risk Assessments and Emergent Work Control, and Follow Up of Events and Notices of Enforcement Discretion
ML0906904589 March 2009Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Kewaunee Power Station License Renewal Application
ML0907708849 March 2009Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives, License Renewal Application
ML09029106129 January 2009Notice of Enforcement Discretion for Dominion Energy Kewaunee, Inc., for Kewaunee Power Station (NOED 09-3-01)
ML09051014927 January 2009Request for Enforcement Discretion from Technical Specification 3.7.a.7, Emergency Diesel Generators
ML08234103912 August 2008Applicants Environmental Report, Operating License Renewal Stage
ML08065031429 February 2008Kewaunee, NRC Generic Letter 2004-02 Supplemental Response, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
ML07296017031 October 2007Public Meeting Summary on the Reactor Oversight Process
ML0721904619 August 2007Appeal of FAQ 69.2 - Emergency Diesel Generator Fuel Oil Line Filling Failure
ML0710200805 April 2007Response to NRC Request for Additional Information Regarding License Amendment Request 230, Emergency Diesel Generator Short-Time Load Testing.
IR 05000305/200600530 January 2007IR 05000305-06-005 and IR 05000305-06-014; 10/01/2006 - 12/31/2006; Kewaunee Power Station. Fire Protection, and Refueling and Other Outage Activities
IR 05000305/200601626 January 2007IR 05000305-06-016 (Drs); 10/23/2006 Through 12/14/2006; Kewaunee Power Station; Evaluation of Changes, Tests, or Experiments (10 CFR 50.59) and Permanent Plant Modifications
IR 05000305/20060048 November 2006IR 05000305-2006-004; 07/01/2006 - 09/30/2006; Kewaunee Power Station; Event Followup
ML0603704409 February 2006RAI - Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accident at Pressurized-Water Reactors
ML0536100921 December 2005Safety Significance Evaluation of Kewaunee Power Station Turbine Building Internal Floods - Volume 1, Revision 1
IR 05000305/200500811 August 2005IR 05000305-05-008, on 04/01/2005 - 06/30/2005, Kewaunee Nuclear Power Plant. Routine Integrated Report. Adverse Weather Protection, Fire Protection, and Maintenance Risk Assessments and Emergent Work Control
ML05179021617 June 2005Response to Request for Additional Information Regarding Risk-Informed Inservice Inspection Program Plan
IR 05000305/20040095 May 2005EA-05-021 Kewaunee Final Significance Determination for a White Finding and Notice of Violation (NRC Inspection Report 05000305/2004009)
ML05088038323 March 2005Containment Equipment Hatch Interference Presentation Data Request
ML05088051017 March 2005NMC Meeting Presentation (Attachment 2)
ML05082020712 March 2005Containment Equipment Hatch Interference Data
ML05061001818 February 2005Response to Request for Additional Information Regarding Risk-Informed Inservice Inspection Program Plan
IR 05000305/200400729 October 2004IR 05000305-04-007; on 07/01/2004 - 09/30/2004; Kewaunee Nuclear Power Plant; Operability Determinations, Post Maintenance Testing, Event Followup, and Other Activities
ML04043063327 February 2004License Amendment No. 172, Authorizing an Increase in the Licensed Reactor Core Power Level of 6.0 Percent from 1673 Megawatts Thermal to 1772 Megawatts Thermal
ML04065037820 February 2004Responses to NRC RAI Regarding License Amendment Request 195, Stretch Power Uprate
ML03358073516 December 2003to Risk-Informed Inservice Inspection Program Plan, Kewaunee Nuclear Power Plant
ML03057044421 February 2003IR 05000305-02-007(DRS), 11/08/2002, Nuclear Management Company, Llc.Safety System Design & Performance Capability Inspection
ML02338053627 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010)
ML02333045727 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010)
ML20056E95525 May 1993Ltr Contract,Awarding Task 17,to Individual Plant Exam Reviews,Internal Events-Back-End Only
ML20056F16416 April 1993Ltr Contract,Awarding Task Order 16, IPE Reviews - Internal Events - Front End Only (Kewaunee), to Contract NRC-04-91-066