IR 05000305/2012004 | 5 November 2012 | IR 05000305-12-004, 07/01/12 - 09/30/2012, Kewaunee Power Station NRC Integrated Inspection Report |
IR 05000305/2012002 | 10 May 2012 | IR 05000305-12-002, on 01/01/2012 - 03/31/2012, Kewaunee Power Station (Kps); Post-Maintenance Testing; Surveillance Testing; and Follow-Up of Events and Notices of Enforcement Discretion |
ML12033A010 | 30 January 2012 | NRR E-mail Capture - ME7110 Kewaunee Amendment Request Chi-over-Q - Rsxb Request for Additional Information (RAI) |
ML102571446 | 7 September 2010 | Holistic Overview of GSI-191 Resolution for Kewaunee Power Station |
ML102371282 | 18 August 2010 | Enclosure (8 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) |
ML101890234 | 2 June 2010 | Enclosure - Q&A to Attachment 1 Volume 05 (Section 3.0) - Kewaunee ITS Conversion Database |
ML101400507 | 19 May 2010 | E-mail Handouts for the 5/20/2010 Kewaunee Public Meeting |
ML101250146 | 26 April 2010 | 2009 Annual Environmental Monitoring Report |
ML092870211 | 14 October 2009 | Revised Questions 4, 6, 7, and 12 of Formal RAI Dated 08/14/2009 GL 2004-02 |
ML092600018 | 15 September 2009 | Handout 1 - GSI-191 Resolution for Kewaunee Power Station |
ML092040006 | 14 August 2009 | RAI, Regarding Response to Generic Letter 2004-02 (Tac No. MC4691) |
IR 05000305/2009003 | 5 August 2009 | IR 05000305-09-003, on 04/01/2009 - 06/30/2009, Kewaunee Power Station, Operability Evaluations, Component Design Bases Inspection, Surveillance Testing; and Follow Up of Events and Notices of Enforcement Discretion |
ML092150896 | 28 July 2009 | Response to Follow-up Question Regarding Severe Accident Mitigation Alternatives (SAMA) |
ML091740649 | 22 June 2009 | Draft RAI on Generic Letter 2004-02 Re. Potential Impact of Debris Blockage of PWR Sumps |
IR 05000305/2009002 | 8 May 2009 | IR 05000305-09-002, on 01/01/2009 - 03/31/2009; Kewaunee Power Station, Flooding, Maintenance Risk Assessments and Emergent Work Control, and Follow Up of Events and Notices of Enforcement Discretion |
ML090690458 | 9 March 2009 | Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Kewaunee Power Station License Renewal Application |
ML090770884 | 9 March 2009 | Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives, License Renewal Application |
ML090291061 | 29 January 2009 | Notice of Enforcement Discretion for Dominion Energy Kewaunee, Inc., for Kewaunee Power Station (NOED 09-3-01) |
ML090510149 | 27 January 2009 | Request for Enforcement Discretion from Technical Specification 3.7.a.7, Emergency Diesel Generators |
ML082341039 | 12 August 2008 | Applicants Environmental Report, Operating License Renewal Stage |
ML080650314 | 29 February 2008 | Kewaunee, NRC Generic Letter 2004-02 Supplemental Response, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
ML072960170 | 31 October 2007 | Public Meeting Summary on the Reactor Oversight Process |
ML072190461 | 9 August 2007 | Appeal of FAQ 69.2 - Emergency Diesel Generator Fuel Oil Line Filling Failure |
ML071020080 | 5 April 2007 | Response to NRC Request for Additional Information Regarding License Amendment Request 230, Emergency Diesel Generator Short-Time Load Testing. |
IR 05000305/2006005 | 30 January 2007 | IR 05000305-06-005 and IR 05000305-06-014; 10/01/2006 - 12/31/2006; Kewaunee Power Station. Fire Protection, and Refueling and Other Outage Activities |
IR 05000305/2006016 | 26 January 2007 | IR 05000305-06-016 (Drs); 10/23/2006 Through 12/14/2006; Kewaunee Power Station; Evaluation of Changes, Tests, or Experiments (10 CFR 50.59) and Permanent Plant Modifications |
IR 05000305/2006004 | 8 November 2006 | IR 05000305-2006-004; 07/01/2006 - 09/30/2006; Kewaunee Power Station; Event Followup |
ML060370440 | 9 February 2006 | RAI - Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accident at Pressurized-Water Reactors |
ML053610092 | 1 December 2005 | Safety Significance Evaluation of Kewaunee Power Station Turbine Building Internal Floods - Volume 1, Revision 1 |
IR 05000305/2005008 | 11 August 2005 | IR 05000305-05-008, on 04/01/2005 - 06/30/2005, Kewaunee Nuclear Power Plant. Routine Integrated Report. Adverse Weather Protection, Fire Protection, and Maintenance Risk Assessments and Emergent Work Control |
ML051790216 | 17 June 2005 | Response to Request for Additional Information Regarding Risk-Informed Inservice Inspection Program Plan |
IR 05000305/2004009 | 5 May 2005 | EA-05-021 Kewaunee Final Significance Determination for a White Finding and Notice of Violation (NRC Inspection Report 05000305/2004009) |
ML050880383 | 23 March 2005 | Containment Equipment Hatch Interference Presentation Data Request |
ML050880510 | 17 March 2005 | NMC Meeting Presentation (Attachment 2) |
ML050820207 | 12 March 2005 | Containment Equipment Hatch Interference Data |
ML050610018 | 18 February 2005 | Response to Request for Additional Information Regarding Risk-Informed Inservice Inspection Program Plan |
IR 05000305/2004007 | 29 October 2004 | IR 05000305-04-007; on 07/01/2004 - 09/30/2004; Kewaunee Nuclear Power Plant; Operability Determinations, Post Maintenance Testing, Event Followup, and Other Activities |
ML040430633 | 27 February 2004 | License Amendment No. 172, Authorizing an Increase in the Licensed Reactor Core Power Level of 6.0 Percent from 1673 Megawatts Thermal to 1772 Megawatts Thermal |
ML040650378 | 20 February 2004 | Responses to NRC RAI Regarding License Amendment Request 195, Stretch Power Uprate |
ML033580735 | 16 December 2003 | to Risk-Informed Inservice Inspection Program Plan, Kewaunee Nuclear Power Plant |
ML030570444 | 21 February 2003 | IR 05000305-02-007(DRS), 11/08/2002, Nuclear Management Company, Llc.Safety System Design & Performance Capability Inspection |
ML023380536 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010) |
ML023330457 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010) |
ML20056E955 | 25 May 1993 | Ltr Contract,Awarding Task 17,to Individual Plant Exam Reviews,Internal Events-Back-End Only |
ML20056F164 | 16 April 1993 | Ltr Contract,Awarding Task Order 16, IPE Reviews - Internal Events - Front End Only (Kewaunee), to Contract NRC-04-91-066 |