NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)10 August 2023Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)
NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)24 July 2023Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)
NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance13 June 2023License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance
NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)6 June 2023Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)
NRC-23-0031, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements16 May 2023Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements
NRC-20-0040, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle23 June 2020Response to NRC Request from Audit of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle
ML20112H84012 May 2020Final ASP Analysis - Fermi (LER 341-01-001)
NRC-18-0054, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)14 December 2018Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
IR 05000341/201800217 August 2018ERRATA-Fermi, Unit 1, NRC Integrated Inspection Report 05000341/2018002
ML18227A09114 August 2018Integrated Inspection Report 05000341/2018002
IR 05000341/201800110 May 2018NRC Integrated Inspection Report 05000341/2018001
IR 05000341/201700313 November 2017NRC Integrated Inspection Report 05000341/2017003
05000341/LER-2017-0049 October 2017Inadequate Procedural Cuidance for Residual I feat Removal Complex Ventilation Systems Leads to Condition Prohibited by Technical Specifications and Loss if Safety Function
LER 17-004-00 for Fermi 2 Regarding Inadequate Procedural Guidance for Residual Heat Removal Complex Ventilation Systems Leads to Condition Prohibited by Technical Specifications and Loss of Safety Function
ML16259A10930 September 2016NUREG-1437, Supplement 56, Volume 2, Fermi, Unit 2, Generic Environmental Impact Statement for License Renewal of Nuclear Plants.
ML16187A36630 June 2016Final ASP Program Analysis - Reject - Fermi Unit 2 Reactor Scram Due to Loss of Turbine Building Closed Cooling Water (LER 341/2015-006)
ML16165A45426 May 2016Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML15300A07331 October 2015NUREG-1437 Dfc, Supp. 56, Vol. 2, Appendices, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 56 Regarding Fermi 2 Nuclear Power Plants.
NRC-15-0013, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Severe Accident Mitigation Alternatives9 January 2015Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Severe Accident Mitigation Alternatives
NRC-14-0028, License Renewal Application, Appendix E, Page 10-1 Through End24 April 2014License Renewal Application, Appendix E, Page 10-1 Through End
IR 05000341/201300527 January 2014IR 05000341-13-005; 10/01/2013 - 12/31/2013; Fermi Power Plant, Unit 2; Heat Sink Performance, Maintenance Effectiveness, and Problem Identification and Resolution
ML11213A03029 July 2011G20110563/EDATS: OEDO-2011-0535 - David Lochbaum Ltr. 2.206 - Boiling Water Reactors with Mark I and Mark II Containment Designs
NRC-10-0004, Submittal of the Inservice Inspection / Nondestructive Examination Program Relief Requests for the Third Ten-year Interval20 January 2010Submittal of the Inservice Inspection / Nondestructive Examination Program Relief Requests for the Third Ten-year Interval
IR 05000341/20060032 August 2006IR 05000341-06-003; 04/01/2006-06/30/2006; Fermi Power Plant, Unit 2; Fire Protection, Maintenance Risk Assessment, Operability Evaluations, Refueling and Outage Activities
ML06003008017 February 2006Transmittal of Final ASP Analyses (August 14, 2003 Grid Disturbance Events)
ML05095055517 December 2004Final Precursor Analysis - Fermi Grid Loop
ML06072014617 December 2004Final Precursor Analysis, LER 341/03-002, Automatic Reactor Trip and Loss of Offsite Power Due to the August 14, 2003, Transmission Grid Blackout
IR 05000341/200400520 May 2004IR 05000341-04-005 on 04/19/2004 - 04/23/2004, Fermi Power Plant, Unit 2; Supplemental Inspection; IP 95001, Inspection for One or Two White Inputs in a Strategic Performance Area
ML20059C65123 September 1993Ltr Contract,Awarding Task Order 24, Individual Plant Exam (IPE) Review,Internal Events - Back-End Only (Fermi Unit 2)
ML20029A26431 August 1989Partially Withheld Vols 1-4 of Fermi 2 - Level 1 Pra.