Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | 10 August 2023 | Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) |
NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | 24 July 2023 | Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) |
NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance | 13 June 2023 | License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance |
NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | 6 June 2023 | Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) |
NRC-23-0031, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements | 16 May 2023 | Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements |
NRC-20-0040, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle | 23 June 2020 | Response to NRC Request from Audit of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle |
ML20112H840 | 12 May 2020 | Final ASP Analysis - Fermi (LER 341-01-001) |
NRC-18-0054, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) | 14 December 2018 | Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) |
IR 05000341/2018002 | 17 August 2018 | ERRATA-Fermi, Unit 1, NRC Integrated Inspection Report 05000341/2018002 |
ML18227A091 | 14 August 2018 | Integrated Inspection Report 05000341/2018002 |
IR 05000341/2018001 | 10 May 2018 | NRC Integrated Inspection Report 05000341/2018001 |
IR 05000341/2017003 | 13 November 2017 | NRC Integrated Inspection Report 05000341/2017003 |
05000341/LER-2017-004 | 9 October 2017 | Inadequate Procedural Cuidance for Residual I feat Removal Complex Ventilation Systems Leads to Condition Prohibited by Technical Specifications and Loss if Safety Function LER 17-004-00 for Fermi 2 Regarding Inadequate Procedural Guidance for Residual Heat Removal Complex Ventilation Systems Leads to Condition Prohibited by Technical Specifications and Loss of Safety Function |
ML16259A109 | 30 September 2016 | NUREG-1437, Supplement 56, Volume 2, Fermi, Unit 2, Generic Environmental Impact Statement for License Renewal of Nuclear Plants. |
ML16187A366 | 30 June 2016 | Final ASP Program Analysis - Reject - Fermi Unit 2 Reactor Scram Due to Loss of Turbine Building Closed Cooling Water (LER 341/2015-006) |
ML16165A454 | 26 May 2016 | Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems |
ML15300A073 | 31 October 2015 | NUREG-1437 Dfc, Supp. 56, Vol. 2, Appendices, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 56 Regarding Fermi 2 Nuclear Power Plants. |
NRC-15-0013, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Severe Accident Mitigation Alternatives | 9 January 2015 | Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Severe Accident Mitigation Alternatives |
NRC-14-0028, License Renewal Application, Appendix E, Page 10-1 Through End | 24 April 2014 | License Renewal Application, Appendix E, Page 10-1 Through End |
IR 05000341/2013005 | 27 January 2014 | IR 05000341-13-005; 10/01/2013 - 12/31/2013; Fermi Power Plant, Unit 2; Heat Sink Performance, Maintenance Effectiveness, and Problem Identification and Resolution |
ML11213A030 | 29 July 2011 | G20110563/EDATS: OEDO-2011-0535 - David Lochbaum Ltr. 2.206 - Boiling Water Reactors with Mark I and Mark II Containment Designs |
NRC-10-0004, Submittal of the Inservice Inspection / Nondestructive Examination Program Relief Requests for the Third Ten-year Interval | 20 January 2010 | Submittal of the Inservice Inspection / Nondestructive Examination Program Relief Requests for the Third Ten-year Interval |
IR 05000341/2006003 | 2 August 2006 | IR 05000341-06-003; 04/01/2006-06/30/2006; Fermi Power Plant, Unit 2; Fire Protection, Maintenance Risk Assessment, Operability Evaluations, Refueling and Outage Activities |
ML060030080 | 17 February 2006 | Transmittal of Final ASP Analyses (August 14, 2003 Grid Disturbance Events) |
ML050950555 | 17 December 2004 | Final Precursor Analysis - Fermi Grid Loop |
ML060720146 | 17 December 2004 | Final Precursor Analysis, LER 341/03-002, Automatic Reactor Trip and Loss of Offsite Power Due to the August 14, 2003, Transmission Grid Blackout |
IR 05000341/2004005 | 20 May 2004 | IR 05000341-04-005 on 04/19/2004 - 04/23/2004, Fermi Power Plant, Unit 2; Supplemental Inspection; IP 95001, Inspection for One or Two White Inputs in a Strategic Performance Area |
ML20059C651 | 23 September 1993 | Ltr Contract,Awarding Task Order 24, Individual Plant Exam (IPE) Review,Internal Events - Back-End Only (Fermi Unit 2) |
ML20029A264 | 31 August 1989 | Partially Withheld Vols 1-4 of Fermi 2 - Level 1 Pra. |