Semantic search

Jump to navigation Jump to search
 Issue dateTitle
RA-21-0272, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b1 November 2021Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
ML20050R56820 February 2020Final Accident Sequence Precursor Analysis-Brunswick Unit 1, Degraded Principal Barrier, Technical Specification Shutdown, and Automatic System Actuation (LER 325-2019-002)-Training/Reject
RA-19-0152, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures,Systems, and Components (Sscs) for Nuclear Power Reactors.8 April 2019Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures,Systems, and Components (Sscs) for Nuclear Power Reactors.
RA-19-2019, Brunswick 2019-301 Post-Exam Comments30 January 2019Brunswick 2019-301 Post-Exam Comments
ML19032A16330 January 2019301 Post-Exam Comments
RA-18-0178, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for ...2 November 2018Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for ...
BSEP 17-0117, Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources..6 December 2017Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources..
BSEP 17-0111, Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements28 November 2017Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements
ML20311A6316 November 20172017 Q1-Q4 ROP Inspection Findings
ML20311A6396 November 20172017 Q1-Q4 ROP Inspection Findings
IR 05000324/20170096 July 2017NRC Problem Identification and Resolution Inspection Report Nos.: 05000325/2017009 and 05000324/2017009
IR 05000324/20160039 November 2016NRC Integrated Inspection Report 05000325/2016003 and 05000324/2016003 and Exercise of Enforcement Discretion
BSEP 16-0024, Notification of Full Compliance with Order EA-12-049, and Order EA-12-05119 May 2016Notification of Full Compliance with Order EA-12-049, and Order EA-12-051
IR 05000324/20150041 February 2016NRC Integrated Inspection Report Nos. 05000325/2015004 and 05000324/2015004 and Notice of Enforcement Discretion
IR 05000324/201500231 July 2015IR 05000325/2015002, 05000324/2015002; April 1, 2015, Through June 30, 2015; Duke Energy Progress, Inc., Brunswick Steam Electric Plant, Units 1 & 2, Fire Protection, Operability Determinations and Functionality Assessments, and Post-Mainte
BSEP 15-0033, Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and Order EA-12-051, Order to Modify Licenses..3 June 2015Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and Order EA-12-051, Order to Modify Licenses..
ML15082A15531 March 2015Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051
BSEP 14-0092, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC ME9623 and ME9624)15 August 2014Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC ME9623 and ME9624)
BSEP 14-0035, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 80510 April 2014Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805
IR 05000324/20130076 December 2013IR 05000325-13-007 and 05000324-13-007, on 9/9/2013 - 10/24/2013; Brunswick Steam Electric Plant, Units 1 and 2, Component Design Bases Inspection
IR 05000324/201300413 November 2013IR 05000325-13-004, 05000324-13-004: on 07/01/13 09/30/13; Brunswick Steam Electric Plant, Units 1 & 2; Operability Evaluations and Post Maintenance Testing
ML13277A04119 September 2013Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition
BSEP 13-0097, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 80529 August 2013Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 805
IR 05000324/20130038 August 2013Integrated Inspection Report 05000325/13-003 and 05000324-13-003
BSEP 13-0070, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 80515 July 2013Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805
BSEP 12-0140, Additional Information Supporting License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)17 December 2012Additional Information Supporting License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)
BSEP 12-0106, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)25 September 2012License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)
ML11271003328 September 2011ROP Tabletop Examples and Results
ML11213A03029 July 2011G20110563/EDATS: OEDO-2011-0535 - David Lochbaum Ltr. 2.206 - Boiling Water Reactors with Mark I and Mark II Containment Designs
IR 05000324/201000527 January 2011IR 05000325-10-005, 05000324-10-005, on 10/01/10 - 12/31/10, Brunswick Steam Electric Plant, Units 1 & 2, Integrated Inspection Report
ML0512300646 April 2005Draft SAMA Response
ML0512205156 April 2005E-mail from Jan Kozyra Regarding Brunswick SAMA Draft Responses
IR 05000324/20040072 April 2004IR 05000324-04-007, on 01/16/04 at Brunswick, Unit 2. Final Significance Determination for a Green Finding Inspection Report
BSEP 02-0019, Response to Request for Additional Information - Request for License Amendments to Adopt Alternative Radiological Source Term4 February 2002Response to Request for Additional Information - Request for License Amendments to Adopt Alternative Radiological Source Term
BSEP-96-0290, Responds to GL 88-20,Supplement 4, Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities15 August 1996Responds to GL 88-20,Supplement 4, Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities
ML20092G39530 September 1995Rev 0 to Brunswick Nuclear Plant Units 1 & 2 USI A-46 Seismic Evaluation Rept, Final Rept
ML20092G38930 September 1995Rev 0 to Brunswick Nuclear Plant Units 1 & 2 USI A-46 Relay Evaluation Rept, Final Rept
ML19204A20930 June 1995Individual Plant Examination for External Events Submittal - Final Report
ML20011D91530 November 1989Review of the Brunswick Steam Electric Plant Probabilistic Risk Assessment
ML20071P71530 November 1989Rev 1 to Brunswick Steam Electric Plant Unit 2 Risk-Based Insp Guide, Final Version
ML20215H57214 April 1987Forwards Info to Demonstrate Adequacy of Standby Liquid Control,Alternate Rod Injection & Recirculation Pump Trip Sys,Per 861021 SER & NRC 870108 Request for plant-specific Reviews Re ATWS Rule 10CFR50.62