Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23361A081 | 8 January 2024 | SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR |
ML24004A185 | 4 January 2024 | SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR Revised |
ML23241A045 | 29 August 2023 | COL Docs - FW Draft LAR and Exemption Request Regarding Tier 1 and Tier 2 Requirements |
ML23202A112 | 2 August 2023 | Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI |
ML23214A221 | 30 July 2023 | Historical Vogtle Unit 3 Combined License Appendix C as of July 30 2023 |
ML23165A213 | 13 June 2023 | Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual Submittal |
ML23165A215 | 13 June 2023 | Enclosure 1: Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Revision 12 |
ML23165A216 | 13 June 2023 | Enclosure 3: Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Tier 1, Revision 11 |
ML23165A219 | 13 June 2023 | Enclosure 9: Vogtle Electric Generating Plant, Units 3 and 4, Technical Specifications Bases, Revision 73 |
NL-23-0455, Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report | 12 June 2023 | Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report |
ML23135A092 | 11 May 2023 | NRR E-mail Capture - Acceptance Review - SNC Fleet Request to Use Specific Provision of a Later Edition of the ASME BPV Code, Section XI (L-2023-LLR-0016) |
ML23109A070 | 4 May 2023 | Enclosure - Safety Evaluation for VEGP3&4 ISI1-ALT-18 |
NL-23-0217, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-02 | 1 May 2023 | License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-02 |
ML23095A297 | 14 April 2023 | Enclosure - VEGP 3&4-ISI1-ALT-17 Safety Evaluation |
NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | 12 April 2023 | GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI |
ML23039A167 | 8 February 2023 | Draft LAR to Remove Tier 1 and Tier 2 Star Requirements |
ML22286A038 | 23 November 2022 | Federal Register Notice of Issuance for Amendment and Exemption Electrical Inspections, Tests, Analyses, and Acceptance Criteria Optimization (LAR 22-003) |
ND-22-0817, Enclosures 1 and 2: Proposed Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds and Alternative for Use of Code Case 648-2 for Inservice Inspection | 4 November 2022 | Enclosures 1 and 2: Proposed Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds and Alternative for Use of Code Case 648-2 for Inservice Inspection |
ML22326A062 | 31 October 2022 | 4 to the Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant and Chapter 2, Site Characteristics (Part 1 of 2) |
ML22326A114 | 31 October 2022 | 4 to the Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (Part 2 of 2); Chapter 11, Chapter 12, Chapter 13, Chapter 14, and Chapter 15 (Part 1 of 2) |
ML22326A121 | 31 October 2022 | 4 to the Updated Final Safety Analysis Report, Chapter 15 (Part 2 of 2), Chapter 16, Chapter 17, Chapter 18, Chapter 19, Table of Contents, Rev 24 Epl |
ML22293B106 | 20 October 2022 | COL Docs - FW: Public Copy - ASME Code Alternative Request Drafts VEGP 3&4-ISI1-ALT-17 (Non-Proprietary) and VEGP 3&4-ISI1-ALT-18 (Non-Proprietary) |
ML22293A244 | 20 October 2022 | COL Docs - FW: Public Copy - ASME Code Alternative Request Drafts VEGP 3&4-ISI1-ALT-17 (Non-Proprietary) and VEGP 3&4-ISI1-ALT-18 (Non-Proprietary) |
ML22259A182 | 22 September 2022 | Request for Proposed Inservice Testing Alternative ALT-VR-01 |
ML22249A091 | 14 September 2022 | Letter to SNC on VEGP, Units 3 & 4, Alternative to the Requirements of the ASME Code for Main Turbine System Valve Testing, VEGP 3&4-IST-ALT-02 |
ML22249A092 | 14 September 2022 | Enclosure - Safety Evaluation the Requirements of the ASME Code for Main Turbine System Valve Testing, VEGP 3&4-IST-ALT-02 |
ML22220A200 | 10 August 2022 | Attachment 2 - NUREG-2194, Vol. 2, Rev. 1, Standard Technical Specifications, Westinghouse Advanced Passive 1000 Plants. Volume 2, Bases |
ML22116A084 | 5 July 2022 | Issuance of Amendment Nos. 215 and 198, Regarding Revision to Technical Specification 3.7.2, Main Steam Isolation Valves (Msivs) |
NL-22-0208, License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490 | 30 June 2022 | License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490 |
ML22167A119 | 15 June 2022 | Submittal of Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual Submittal |
ML22179A146 | 15 June 2022 | Tier 1, Revision 10, Updated Through 04/22/2022 |
ML22179A148 | 15 June 2022 | Technical Specifications Bases, Revision 70 |
ML22118A076 | 13 May 2022 | Cover Letter for Vogtle Electric Generating Plant, Units 3 and 4 Request for Alternative Requirements for Inservice Test Interval Code Edition (VEGP 3&4-IST-ALT-01R2) |
ML22118A077 | 13 May 2022 | Safety Evaluation Regarding Request for Alternative Requirements for Inservice Test Interval Code Edition (VEGP 3&4-IST-ALT-01R2) |
ML22069A004 | 27 April 2022 | Issuance of Amendments Revision to TSs to Adopt TSTF-269-A, Rev. 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves |
ML22077A543 | 4 April 2022 | Summary of Meeting with Southern Nuclear Operating Co |
ML22091A316 | 1 April 2022 | NRC Initial Test Program and Operational Programs Inspection Reports 05200025/2022002, 05200026/2022002 |
ML22087A068 | 31 March 2022 | Draft LAR 22-001, Unit 4 Security ITAAC for 3-31-22 Public Meeting with SNC |
ML22040A213 | 10 February 2022 | NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2021008, 05200026/2021008 |
ML21237A239 | 15 October 2021 | Exemption Unit 4 - Vogtle Electric Generating Plant LAR-21-001: Clarification of ITAAC Regarding Invessel Components |
ML21237A238 | 15 October 2021 | Exemption Unit 3 - Vogtle Electric Generating Plant LAR-21-001: Clarification of ITAAC Regarding Invessel Components |
ND-21-0772, Request for License Amendment and Exemption: Clarification of ITAAC Regarding Invessel Components (LAR-21-001) | 24 August 2021 | Request for License Amendment and Exemption: Clarification of ITAAC Regarding Invessel Components (LAR-21-001) |
ML21230A016 | 19 August 2021 | Invessel As-built ITAAC Draft LAR 21-001 for 210819 Psm |
ML21197A042 | 15 July 2021 | Vog U1 Isi/Sgisi Request for Information (RFI) Letter |
ML21161A201 | 22 June 2021 | Associated Independent Spent Fuel Storage Facilities - Reduction in Commitment to the Quality |
ML21179A118 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 3, Section 3.9, Mechanical Systems and Components |
ML21179A097 | 15 June 2021 | to Tier 1 |
ML21179A098 | 15 June 2021 | Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual Submittal |
ML21179A096 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML21179A123 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |