Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23291A344 | 12 October 2023 | 1 to Updated Final Safety Analysis Report, Table of Contents |
ML23291A372 | 12 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 6, Section 6.6, In-Service Inspection of Class 2 and 3 Components |
ML23291A373 | 12 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 1, Section 1.6, Material Incorporated by Reference |
ML23291A375 | 12 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 5, Section 5.2, Integrity of Reactor Coolant Pressure Boundary |
ML23291A378 | 12 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 1, Section 1.8, Symbols and Terms Used in Engineering and Text |
ML23291A388 | 12 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 3, Section 3.14, License Renewal Programs, TLAA, and Commitments |
ML23257A122 | 19 September 2023 | Authorization and Safety Evaluation for Alternative Request for Valve 251130 |
PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval | 3 August 2023 | Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval |
PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence | 8 June 2023 | Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence |
PLA-8031, Emergency Plan Revision 66 (PLA-8031) | 7 November 2022 | Emergency Plan Revision 66 (PLA-8031) |
ML21294A195 | 12 October 2021 | 0 to Updated Final Safety Analysis Report, Section 3.14, License Renewal Programs, TLAA, and Commitments |
ML21294A103 | 12 October 2021 | 0 to Updated Final Safety Analysis Report, Summary Table of Contents |
ML21294A149 | 12 October 2021 | 0 to Updated Final Safety Analysis Report, Section 1.6, Material Incorporated by Reference |
ML21294A189 | 12 October 2021 | 0 to Updated Final Safety Analysis Report, Section 6.6, In-Service Inspection of Class 2 and 3 Components |
ML21294A191 | 12 October 2021 | 0 to Updated Final Safety Analysis Report, Section 5.2, Integrity of Reactor Coolant Pressure Boundary |
ML21095A304 | 19 April 2021 | Relief Request 4RR-02 Regarding Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds |
ML20168B004 | 21 January 2021 | Issuance of Amendment Nos. 278 and 260 to Allow Application of Advanced Framatome Atrium 11 Fuel Methodologies (EPID L-2019-LLA-0153) (Redacted) |
PLA-7636, Redacted - Susquehanna Steam Electric Station, Units 1 & 2, Revision 68 to Final Safety Analysis Report, Chapter 3, Section 3.9 to 3.14, Conformance with NRC General Design Criteria. Part 2 of 2 | 16 October 2017 | Redacted - Susquehanna Steam Electric Station, Units 1 & 2, Revision 68 to Final Safety Analysis Report, Chapter 3, Section 3.9 to 3.14, Conformance with NRC General Design Criteria. Part 2 of 2 |
ML18116A111 | 16 October 2017 | Redacted - Susquehanna Steam Electric Station, Units 1 & 2, Revision 68 to Final Safety Analysis Report, Chapter 1, Introduction |
ML18122A338 | 16 October 2017 | Redacted - Susquehanna Steam Electric Station, Units 1 & 2, Revision 68 to Final Safety Analysis Report, Chapter 5, Summary Description |
ML16069A199 | 10 May 2016 | Relief Requests for the Third 10-Year Inservice Inspection Interval (CAC Nos. MF6302 Through MF6307) |
ML15218A625 | 14 August 2015 | Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 14, 2015 |
PLA-7287, Flood Hazards Reevaluation Report PLA-7287 | 3 March 2015 | Flood Hazards Reevaluation Report PLA-7287 |
PLA-7194, Susequehanna Steam Electric Station, Unit 2 - Inservice Testing Program Plan | 18 June 2014 | Susequehanna Steam Electric Station, Unit 2 - Inservice Testing Program Plan |
ML14141A073 | 9 June 2014 | Relief Requests for the Fourth 10-Year Inservice Inspection Interval (TAC Nos. MF2705 Through MF2714) |
PLA-7245, Ppl Talen Energy - Appendices in Support of Joint Application - Non-Proprietary Version | 9 June 2014 | Ppl_Talen Energy - Appendices in Support of Joint Application - Non-Proprietary Version |
PLA-7178, Inservice Inspection Program Plan for the Fourth Ten-Year Interval | 2 June 2014 | Inservice Inspection Program Plan for the Fourth Ten-Year Interval |
ML14028A395 | 12 March 2014 | Request for Relief 3RR-20 from the Requirements of the American Society of Mechanical Engineers Section XI |
ML12221A355 | 27 July 2012 | PPL Corporation Annual Report 2011 |
ML12062A133 | 6 March 2012 | ME7902 & ME7903-Approval of RR-2012-001 Use of Later Edition of the ASME OM Code for Check Valve Condition Monitoring Program |
PLA-6814, Request in Accordance with 10 CFR 50.55a(f)(4)(iv) for IST Components to Use Subsequent ASME OM Code Edition and Addenda for the Remainder of the Third Ten-Year IST Interval Revision 1, PLA-6814 | 13 February 2012 | Request in Accordance with 10 CFR 50.55a(f)(4)(iv) for IST Components to Use Subsequent ASME OM Code Edition and Addenda for the Remainder of the Third Ten-Year IST Interval Revision 1, PLA-6814 |
PLA-6774, Request in Accordance with 10 CFR 50.55A(f)(4)(iv) for IST Components to Use Subsequent ASME Om Code Edition and Addenda for the Remainder of the Third Ten-Year IST Interval PLA-6774 | 31 January 2012 | Request in Accordance with 10 CFR 50.55A(f)(4)(iv) for IST Components to Use Subsequent ASME Om Code Edition and Addenda for the Remainder of the Third Ten-Year IST Interval PLA-6774 |
ML11220A365 | 29 July 2011 | PPL Corporation Annual Report 2010 |
PLA-6624, Annual Financial Report | 25 July 2010 | Annual Financial Report |
PLA-6628, Proposed Amendment No. 306 to License NPF-14 & Proposed Amendment No. 277 to License NPF-22: Withdrawal & Resubmittal of Request for Approval of the Cyber Security Plan | 22 July 2010 | Proposed Amendment No. 306 to License NPF-14 & Proposed Amendment No. 277 to License NPF-22: Withdrawal & Resubmittal of Request for Approval of the Cyber Security Plan |
ML091960076 | 29 June 2009 | Enclosure 1 - PPL Corporation 2008 Annual Report |
PLA-6507, License Renewal Application (LRA) Draft Safety Evaluation Report (SER) Comments | 5 May 2009 | License Renewal Application (LRA) Draft Safety Evaluation Report (SER) Comments |
ML090700454 | 31 March 2009 | NUREG-1437, Supplement 35, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Susquehanna Steam Electric Station Units 1 and 2 Final Report |
PLA-6359, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (CLIIP) PLA-6359 | 20 February 2009 | Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (CLIIP) PLA-6359 |
ML083510740 | 8 January 2009 | Request for Relief from the Requirements of the ASME OM Code |
PLA-5604, Proposed Amendment No. 253 to License NPF-14 and Proposed Amendment No. 218 to License NPF-22: Request for Adoption of TSTF-460-A, Rev. 0, Control Rod Scram Time Test Frequency Using the CLIIP | 7 July 2008 | Proposed Amendment No. 253 to License NPF-14 and Proposed Amendment No. 218 to License NPF-22: Request for Adoption of TSTF-460-A, Rev. 0, Control Rod Scram Time Test Frequency Using the CLIIP |
PLA-6330, Proposed Amendment Nos. 300 and 270: Request for Adoption of TSTF-475, Rev. 1, Control Rod Notch Testing Frequency and SRM Insert Control Rod Action, Using the Consolidated Line Item Improvement Process (CLIIP) | 7 July 2008 | Proposed Amendment Nos. 300 and 270: Request for Adoption of TSTF-475, Rev. 1, Control Rod Notch Testing Frequency and SRM Insert Control Rod Action, Using the Consolidated Line Item Improvement Process (CLIIP) |
ML082880729 | 31 May 2008 | Draft Comprehensive Plan for the Water Resources of the Susquehanna River Basin |
ML081140337 | 1 April 2008 | NUREG-1437, Supplement 35, Dfc Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 35, Regarding Susquehanna Steam Electric Station Units 1 & 2, Draft Report for Comment. |
ML080440151 | 20 February 2008 | Third 10-Year Inservice Inspection Interval Program Relief Request No. 3RR-14 |
PLA-6141, Request for an Amendment to the Technical Specifications: Request for Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities Using the Consolidated Line Item Improvement Process (CLIIP) | 8 June 2007 | Request for an Amendment to the Technical Specifications: Request for Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities Using the Consolidated Line Item Improvement Process (CLIIP) |
ML071210032 | 4 May 2007 | Audit and Review Plan for Plant Aging Management Reviews, Aging Management Programs, and Time-Limited Aging Analyses for the Susquehanna Steam Electric Station, Units 1 and 2 |
ML063460050 | 1 December 2006 | Susquehanna Steam Electric Station, Proposed License Amendment, Arts/Mella Implementation - Response to NRC Request for Additional Information |
ML070320806 | 16 October 2006 | Acceptance Review Checklist from Mullins Regarding the Susquehanna Steam Electric Station Environmental Report |
ML062630235 | 13 September 2006 | License Renewal Application, Appendix E, Environmental Report Through End |