Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML22215A003 | 3 August 2022 | R. E. Ginna Nuclear Power Station - Nuclear Radiological Emergency Plan Document Revision. Includes EP-AA-1012, Addendum 3, Appendix 1, Revision 2, R.E. Ginna EAL Wallboard |
ML22094A107 | 22 June 2022 | R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 151 Adopt 10 CFR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors |
ML21287A006 | 14 October 2021 | Supplemental Information No.1 for R.E. Ginna Nuclear Power Plant to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, - Risk-Informed Categorization and Treatment of Structu |
ML21250A382 | 29 September 2021 | R. E. Ginna Nuclear Power Plant - Issuance of Relief Request I6R-06 Alternate Inspection for Reactor Vessel Internals |
ML21140A324 | 20 May 2021 | R. E. Ginna Nuclear Power Plant - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b |
ML20339A068 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems, Table of Contents |
ML20339A033 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Sections 2.1 Through 2.5 |
ML20339A022 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 4, Reactor, Sections 4.1 Thru 4.6 |
ML20339A044 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 1, Table of Content |
ML20339A055 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Section 3.8, Design of Seismic Category I Structures |
ML20339A221 | 20 November 2020 | Technical Specifications Bases, Rev 101 |
ML20339A182 | 20 November 2020 | Fire Protection Program, Revision 18, Volumes I - III |
ML20339A101 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses |
ML20339A013 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Section 5.1 Thru 5.8 |
ML20339A065 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Sections 6.1 Through 6.6 |
ML20339A057 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Sections 3.9 Through 3.11 |
ML20339A062 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 8, Electric Power, Sections 8.1 Through 8.3 |
ML20339A058 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Table of Contents |
ML20339A019 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 3 Appendix 3A, Initial Evaluation of Capability to Withstand Tornadoes Thru 3B, Design of Large Opening Reinforcements for Containment Vessel |
ML20339A012 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant, Sections 1.1 Through 1.8 |
ML20339A020 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Sections 3.1 Through 3.7 |
ML20339A025 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Sections 9.1 Through 9.5 |
ML20339A050 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Sections 13.1 Through 13.6 |
ML20339A027 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Sections 7.1 Through 7.7 |
ML20339A060 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 18, Updated Final Safety Analysis Report Supplement for License Renewal, Sections 18.1 Through 18.4 |
ML20339A038 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Table of Contents |
ML20248H388 | 4 September 2020 | Response to Request for Additional Information - License Amendment Request for Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System. |
ML20107F834 | 16 April 2020 | (EA-19-122) Response to Contested Notice of Violation Documented in U.S. Nuclear Regulatory Commission R.E. Ginna Inspection Report 05000244/2019010 |
ML20085H900 | 25 March 2020 | R. E. Ginna Nuclear Power Plant, License Amendment Request for Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation Test Times and Completion Times |
ML19325D824 | 23 December 2019 | R. E. Ginna Nuclear Power Plant Issuance of Amendment No. 136 to Revise Technical Specification 5.5.15, Containment Leakage Rate Testing Program, to Extend Containment Integrated Leak Rate Test Frequency |
ML19322A009 | 14 November 2019 | U.S. Nuclear Regulatory Commission Acknowledgement of Disputed Cited Violation 05000244/2019010-02 |
ML19291A173 | 16 October 2019 | Reply to Notice of Violation 05000244/2019010-02 |
ML19204A349 | 23 July 2019 | R. E. Ginna Nuclear Power Plant: License Amendment Request - Increase the Main Steam Safety Valve Lift Setpoint Tolerance |
ML19162A175 | 6 June 2019 | 10 CFR 50.54(q)(5) Procedure Change Summary Analysis |
ML19150A468 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 6, Sections 6.1 Thru 6.6 |
ML19150A474 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 08, Sections 8.1 Thru 8.3 |
ML19150A445 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Section 3.8, Design of Seismic Category I Structures |
ML19150A506 | 10 May 2019 | R.E Ginna Nuclear Power Plant Revision 17 to Fire Protection Program |
ML19150A448 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A, Initial Evaluation of Capability to Withstand Tornadoes |
ML19150A446 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.9, Mechanical Systems and Components |
ML19150A492 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Sections 13.1 Thru 13.6 |
ML19150A491 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 13, Table of Contents |
ML19150A471 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.1 Thru 7.7 |
ML19150A444 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems |
ML19150A457 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 4, Sections 4.1 Through 4.6 |
ML19150A478 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 09, Sections 9.1 Thru 9.5 |
ML19150A498 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis, Sections 15.1 Thru 15.8 |
ML19150A511 | 10 May 2019 | Revision 90 to Technical Specification Bases |
ML19150A465 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.1 Thru 5.8 |
ML19150A431 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 1, Table of Content |