Semantic search

Jump to navigation Jump to search
 SiteStart dateTitleDescription
IR 05000528/2022001Palo Verde9 May 2022Integrated Inspection Report 05000528/2022001, 05000529/2022001 and 05000530/2022001
ML22111A108Saint Lucie4 March 2022Amendment 27 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses, Part 1
ML22111A107Saint Lucie4 March 2022Amendment 27 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses, Part 2
ML22111A104Saint Lucie4 March 2022Amendment 27 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML22014A415Palo Verde14 January 2022Request for Exemption from Certain Requirements in 10 CFR 50.62(c)(1) Using Risk-Informed Process for Evaluations
ENS 55626Palo Verde6 December 2021 19:03:00Unit 3 Automatic TripThe following event description is based on information currently available. If through subsequent reviews of this event additional information is identified that is pertinent to this event or alters the information being provided at this time a follow-up notification will be made via the ENS or under the reporting requirements of 10CFR50.73. At 1203 MST on December 6, 2021, the Unit 3 reactor automatically tripped on low departure from nucleate boiling ratio. A part-strength control element assembly was being moved at the time of the trip. Unit 3 is stable and in Mode 3. In response to the reactor trip, all control element assemblies inserted fully into the core. Safety-related electrical power remains energized from off-site power sources and reactor coolant pumps continue to provide forced circulation through the reactor. Decay heat is being removed by the steam bypass control system and main feedwater system. Required systems operated as expected. No emergency classification was required per the Emergency Plan. The NRC Senior Resident Inspector has been informed. Units 1 and 2 were unaffected by this transient.
ML22013A672Saint Lucie11 November 2021Amendment 31 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System
ML22013A677Saint Lucie11 November 2021Amendment 31 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML22013A664Saint Lucie11 November 2021Amendment 31 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis
ML21265A289Saint Lucie15 September 2021Enclosure 2 - Volume 4 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Chapter 2.0 Safety Limits, Revision 0