ENS 5433316 October 2019 14:28:00On October 16, 2019, at 0829 (EDT), an individual was transported for treatment to an offsite facility to address a personal medical issue. Due to the nature of the medical condition, only a partial survey could be completed prior to transport. Follow-up surveys performed by radiation protection technicians identified no radiological contamination of the worker or of the ambulance and response personnel. This event is being reported per 10 CFR 50.72(b)(3)(xii), 'Any event requiring the transport of a radioactively contaminated person to an offsite medical facility for treatment.' The NRC Resident Inspectors have been notified.
ENS 5147215 October 2015 20:54:00

This is a non-emergency eight hour notification for a loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) as the discovered condition affects the functionality of an emergency response facility. A condition impacting functionality of the TSC Ventilation system was discovered on October 15, 2015 at 1554 EDT. The issue involved a loss of heating capability of the TSC Ventilation system due to failed ventilation system components. The review of the impact of this equipment failure on the habitability of the TSC over the 30 day mission time determined that this condition was reportable as a loss of emergency assessment capability. The repair of the equipment failure is currently being planned. If an emergency is declared requiring TSC activation during the non-functional period, the TSC will be staffed and activated using existing emergency planning procedures unless the TSC becomes uninhabitable due to ambient temperature, radiological, or other conditions. If relocation of the TSC becomes necessary, the Emergency Director will relocate the TSC staff to an alternate location in accordance with applicable site procedures. This condition does not affect the health and safety of the public or station employees. The NRC Resident Inspector has been notified.

  • * * RETRACTION ON 11/12/2015 AT 1453 EST FROM JOHN CAVES TO MARK ABRAMOVITZ * * *

Subsequent calculations determined that the loss of heating capability of the TSC Ventilation system did not affect the TSC functionality at the time of discovery or during the 30 day mission time period. Therefore, the TSC remained functional throughout the time in question. The initial 10 CFR 50.72(b)(3)(xiii) report is being retracted. The NRC Resident Inspector has been informed of this notification retraction. Notified the R2DO (Ehrhardt).