Semantic search

Jump to navigation Jump to search
 Entered dateEvent description
ENS 403703 December 2003 07:05:00The "2 D" steam generator Lo-2 level was caused by the loss of the "2C" feedwater pump while performing the "2 BWOS" feedwater weekly surveillance of the HP stop valve. Both trains of the aux feed actuated as expected on the "2D" Lo-2 s/g level signal. The plant is currently in mode 3 with all rods fully inserted. No ECCS or safety relief valves actuated. Licensee notified the NRC Resident Inspector