Semantic search

Jump to navigation Jump to search
 Entered dateEvent description
ENS 5287225 July 2017 11:07:00On July 25, 2017, at 0428 Eastern Daylight Time (EDT) Watts Bar Nuclear Plant (WBN) Unit 2 was in Mode 3, beginning a Reactor Startup. While in the initial phase of withdrawing the first of four Control Rod banks, the two associated group demand position indicators deviated greater than 2 steps from each other. In accordance with Technical Requirement 3.1.7, Position Indication System, Shutdown, with one or more group demand position indicators inoperable, the reactor trip breakers are to be opened immediately. Operations personnel opened the reactor trip breakers immediately by initiating a manual trip of the Reactor Protection System (RPS). The Auxiliary Feedwater system was in service and controlling Steam Generator water levels at the time of the event and did not receive any valid actuation signals. No other system actuations occurred as a result of this reactor trip and all systems operated as designed. The cause of the position indication system inoperability is currently under investigation. NRC Resident Inspector has been notified.