 Entered dateEvent description
ENS 517622 March 2016 04:27:00

The turbine tripped for an unknown cause followed by a reactor trip. All systems are functioning as designed. Operators have transitioned out of the EOP (Emergency Operating Procedure) network into normal operating procedures. The plant is stable in mode 3. All control rods fully inserted during the trip and no safety or relief valves lifted. The plant is in its normal shutdown electrical lineup. Emergency Feedwater actuation occurred to restore steam generator levels. The plant expects to make a press release. The licensee notified the NRC Resident Inspector.

  • * * UPDATE AT 1043 EST ON 3/2/16 FROM BARRY BRADBURY TO S. SANDIN * * *

The licensee will not issue a press release for this event. The licensee will inform the NRC Resident Inspector. Notified R1DO (Cook).