Semantic search

Jump to navigation Jump to search
 Start dateStatusTitleTopic
EPID:L-2022-LLA-023521 March 2023Approved
Closed
EPID:L-2022-LLA-009830 June 2022Approved
Closed
EPID:L-2021-LLA-023422 December 2021Approved
Closed
TSTF-269
EPID:L-2021-LLA-022913 December 2021Approved
Closed
License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure
EPID:L-2021-LLA-017529 September 2021Approved
Closed
TSTF-554
EPID:L-2021-LLA-016317 September 2021Approved
Closed
TSTF-577
EPID:L-2021-LLA-013629 July 2021Approved
Closed
FSAR Exemption - ML21
EPID:L-2021-LLA-011522 June 2021Approved
Closed
License Amendment Request to Remove Table of Contents from Technical Specifications
EPID:L-2021-LLE-00319 June 2021Approved
Closed
Units 1 and 2 and Vogtle Electric Generating Plant - Units 1 and 2, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule
EPID:L-2021-LLA-01099 June 2021Approved
Closed
Units 1 and 2, Vogtle Electric Generating Plant - Units 1 and 2, Voluntary License Amendment Request to Use Beacon Power Distribution Monitoring System
EPID:L-2021-LLA-005225 March 2021Approved
Closed
License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, Administrative Controls
EPID:L-2021-LRM-002318 February 2021Approved
Closed
EPID:L-2020-LLE-01834 December 2020Approved
Closed
EPID:L-2020-LLA-023230 October 2020Approved
Closed
TSTF-542
TSTF-541
EPID:L-2020-LLE-014821 September 2020Approved
Closed
Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic
EPID:L-2020-LLA-015030 June 2020Approved
Closed
Southern Nuclear Operating Co., Inc. - License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions
EPID:L-2020-LLA-012129 June 2020Approved
Closed
TSTF-567
EPID:L-2020-LRO-001917 April 2020Approved
Closed
Refueling Outage 1R29 Steam Generator Tube Inspection Report
EPID:L-2020-LLR-003324 February 2020Withdrawn
Closed
Proposed Inservice Inspection Alternative FNP-ISI-AL T-05-06, Version 1.0
EPID:L-2019-LLA-027812 December 2019Approved
Closed
License Amendment Request: Revise Measurement Units Associated with Reactor Trip System Nuclear Instrument Comparison Surveillance and Trip Setpoint for Control Room Air Intake Radiation Monitors
EPID:L-2019-LRO-008524 October 2019Approved
Closed
Refueling Outage 2R26 Steam Generator Tube Inspection Report
EPID:L-2019-LLA-021230 September 2019Approved
Closed
Submittal of License Amendment Request to Update the Spent Fuel Pool Criticality Safety Analysis and Revise Technical Specification (TS) 3.7.15 Spent Fuel Assembly Storage and TS 4.3 Fuel Storage.
EPID:L-2019-LLA-015015 July 2019Approved
Closed
TSTF-563
EPID:L-2019-LLA-002715 February 2019Approved
Closed
TSTF-569
EPID:L-2018-LLA-022331 January 2019Approved
Closed
EPID:L-2018-LLA-056614 December 2018Approved
Closed
Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material
EPID:L-2018-LLA-048630 October 2018Approved
Closed
TSTF-471
EPID:L-2018-LLA-021027 July 2018Approved
Closed
TSTF-500
TSTF-505
TSTF-412
EPID:L-2017-LLR-011523 April 2018Withdrawn
Closed
Withdrawal of Alternatives FNP-ISI-ALT-05-02 and VEGP-ISI-ALT-04-02
EPID:L-2017-LLA-042921 December 2017Approved
Closed
TSTF-412
CAC:MG009411 August 2017Approved
Closed
CAC:MF99423 July 2017Withdrawn
Closed
CAC:MF889027 June 2017Approved
Closed
EPID:L-2017-LLA-04287 June 2017Approved
Closed
Plant Shutdown Required by Technical Specifications due to Inoperable Steam Flow Transmitters, LER 16-007-01 for Joseph M. Farley, Unit 1, Regarding Plant Shutdown Required by Technical Specifications due to Inoperable Steam Flow Transmitters
CAC:MF946522 March 2017Approved
Closed
CAC:MF884515 March 2017Approved
Closed
CAC:MF886122 November 2016Approved
Closed
CAC:MF845811 October 2016Approved
Closed
CAC:MF846011 October 2016Approved
Closed
CAC:MF88444 October 2016Approved
Closed
CAC:MF83628 September 2016Approved
Closed
CAC:MF81761 September 2016Approved
Closed
CAC:MF887029 August 2016Approved
Closed
CAC:MF07168 August 2016Approved
Closed
CAC:MF77437 June 2016Approved
Closed
CAC:MF746617 May 2016Approved
Closed
CAC:MF761725 April 2016Approved
Closed
TAC:MF45608 April 2016Approved
Closed
CAC:MF61187 April 2016Approved
Closed
CAC:MF748016 March 2016Approved
Closed