Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000416/LER-2016-00916 August 2017Entry into Mode of Applicability with the Oscillation Power Range Monitor Upscale Settings Incorrectly Set
LER 16-009-01 for Grand Gulf, Unit 1, Regarding Entry into Mode of Applicability with the OPRM Upscale Settings Incorrectly Set
05000416/LER-2016-00816 August 2017Entry into Mode of Applicability with the Alternate Decay Heat Removal System Inoperable
LER 16-008-001 for Grand Gulf, Unit 1, Regarding Entry into Mode of Applicability with the Alternate Decay Heat Removal System Inoperable
05000416/LER-2017-00128 March 2017High Pressure Core Spray (HPCS) Jockey Pump Trip
LER 17-001-00 for Grand Gulf, Unit 1, Regarding High Pressure Core Spray Jockey Pump Trip
05000416/LER-2016-00116 May 2016Valid Engineered Safety Feature Actuation and Temporary Loss of Residual Heat Removal
LER 16-001-00 for Grand Gulf, Unit 1, Regarding Valid Engineered Safety Feature Actuation and Temporary Loss of Residual Heat Removal
High winds
GNRO-2014/00049, Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package, Revision 1131 July 2014Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package, Revision 11
ML12157A18223 May 2012Attachment 9 to GNRO-2012/00039 - Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Patton - Attachment L Labeled Reporting Documentation - Unit 2 Sumps.Fatality
ML06271004522 August 2005Final Precursor Analysis - Grand Gulf, Unit 1High winds
Mission time
Offsite Circuit