Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
05000416/LER-2016-009 | 16 August 2017 | Entry into Mode of Applicability with the Oscillation Power Range Monitor Upscale Settings Incorrectly Set LER 16-009-01 for Grand Gulf, Unit 1, Regarding Entry into Mode of Applicability with the OPRM Upscale Settings Incorrectly Set | |
05000416/LER-2016-008 | 16 August 2017 | Entry into Mode of Applicability with the Alternate Decay Heat Removal System Inoperable LER 16-008-001 for Grand Gulf, Unit 1, Regarding Entry into Mode of Applicability with the Alternate Decay Heat Removal System Inoperable | |
05000416/LER-2017-001 | 28 March 2017 | High Pressure Core Spray (HPCS) Jockey Pump Trip LER 17-001-00 for Grand Gulf, Unit 1, Regarding High Pressure Core Spray Jockey Pump Trip | |
05000416/LER-2016-001 | 16 May 2016 | Valid Engineered Safety Feature Actuation and Temporary Loss of Residual Heat Removal LER 16-001-00 for Grand Gulf, Unit 1, Regarding Valid Engineered Safety Feature Actuation and Temporary Loss of Residual Heat Removal | High winds |
GNRO-2014/00049, Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package, Revision 11 | 31 July 2014 | Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package, Revision 11 | |
ML12157A182 | 23 May 2012 | Attachment 9 to GNRO-2012/00039 - Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Patton - Attachment L Labeled Reporting Documentation - Unit 2 Sumps. | Fatality |
ML062710045 | 22 August 2005 | Final Precursor Analysis - Grand Gulf, Unit 1 | High winds Mission time Offsite Circuit |