  1. 05000416/FIN-2017007-02 (Site: Grand Gulf, Quarter: 2017Q4, Title: Failure to Correct Standby Diesel Generator Trip)
  2. 05000374/FIN-2017010-01 (Site: LaSalle, Quarter: 2017Q4, Title: Failure To Ensure Fire Door Was Engaged And Pinned)
  3. 05000461/FIN-2017004-03 (Site: Clinton, Quarter: 2017Q4, Title: Failure to Identify the Extent of Condition for an Inadequate 10 CFR 50.59 Evaluation)
  4. 05000251/FIN-2017004-01 (Site: Turkey Point, Quarter: 2017Q4, Title: Failure to Perform an Adequate ASME BPVC Section XI Repair/Replacement Plan for a Code Class 1 and 2 Replacement)
  5. 05000413/FIN-2017004-03 (Site: Catawba, Quarter: 2017Q4, Title: Failure to Follow Administrative Procedures)
  6. 05000324/FIN-2017004-01 (Site: Brunswick, Quarter: 2017Q4, Title: Loss of Emergency 4160V Bus Due to Failure to Implement Procedure)
  7. 05000445/FIN-2017003-02 (Site: Comanche Peak, Quarter: 2017Q3, Title: Programmatic Failures to Control Transient Combustible Material in Accordance with a Fire Protection Procedure)
  8. 05000354/FIN-2017007-01 (Site: Hope Creek, Quarter: 2017Q3, Title: Secondary Containment Integrity Not Maintained Due to Door not Properly Dogged)
  9. 05000289/FIN-2017403-03 (Site: Three Mile Island, Quarter: 2017Q3, Title: Security)
  10. 05000293/FIN-2017002-01 (Site: Pilgrim, Quarter: 2017Q2, Title: Failure to Follow Procedure Requirements for the Control of a Flood Protection Barrier)