| Start date | Site | Title |
---|
IR 05000317/2023004 | 1 February 2024 | Calvert Cliffs | Integrated Inspection Report 05000317/2023004 and 05000318/2023004 |
IR 05000354/2023004 | 1 February 2024 | Hope Creek | Integrated Inspection Report 05000354/2023004 |
RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX | 8 January 2024 | Oconee Mcguire Harris Robinson McGuire | Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX |
ML23284A272 | 4 December 2023 | | Rev 2 (DG-1364) Damping Values for Seismic Design of Nuclear Power Plants |
ML23334A182 | 30 November 2023 | Pilgrim | Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 |
ML23319A098 | 30 November 2023 | 05000610 | Enclosuabilene Christian University Molten Salt Research Reactor Preliminary Safety Analysis Report, Revision 1, November 2023 |
WBL-23-052, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual | 8 November 2023 | Watts Bar | Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual |
ML23310A051 | 6 November 2023 | Callaway | EIP-ZZ.OO1O1, Addendum 2, Revision 22, Emergency Action Level Technical Bases Document |
RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power | 2 November 2023 | Mcguire McGuire | Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power |
ML23319A078 | 31 October 2023 | Farley | 1 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations |