ML20149K347

From kanterella
Jump to navigation Jump to search
Final ASP Analysis - Haddam Neck (LER 213-80-004)
ML20149K347
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/28/2020
From: Christopher Hunter
NRC/RES/DRA/PRB
To:
Littlejohn J (301) 415-0428
References
LER 1980-004-3L
Download: ML20149K347 (4)


Text

SIC Accession Number: 154451 ate: February 12, 1980 itle: Inadvertent Opening of PORV at Haddam Neck he failure sequence was:

1. With the reactor at full power, spurious signal to the PORV and its isolation block valve was initiated in Pressurizer Pressure Control Channel 1.
2. Both valves opened and the RCS depressurized to 1992 psig.
3. The PORV and its associated block valve were remote-manually closed within approximately 10 seconds of the start of the transient. RCS pressure was restored to greater than 2000 psig within 2 minutes, terminating the transient.

orrective action:

Investigation and testing did not reveal the source of the roblem. The channel and valve controls were placed in the normal perating mode.

esign purpose of failed system or component:

PORVs are designed to prevent challenges to the main safety valves nd to assist in control of RCS pressure.

Damage No No - small-break LOCA mitigation capability prevents core damage No 154451 - Actual Occurrence for Inadvertent Opening of PORV at Haddam Neck

LOCA Trip Feedwater and Pressure Recirculation Severe No.

Secondary Injection and LPR/HPI Core Heat Removal Cross-Connect Damage No I Yes 2 Yes 3 No 45 Yes 5 Yes 6 Yes 7 NSIC 154451 - Sequence of Interest for Inadvertent Opening of PORV at Haddam Neck

ACCESSION NUMBER: 154451 NO.: 80-04/3L E OF LER: February 12, 1980 E OF EVENT: February 4, 1980 EM INVOLVED: Pressurizer relief system PONENT INVOLVED: PORV and block valve SE: Spurious actuation signal UENCE OF INTEREST: Small break LOCA UAL OCCURRENCE: Inadvertent opening of a PORV and block valve CTOR NAME: Haddam Neck KET NUMBER: 50-213 CTOR TYPE: PWR IGN ELECTRICAL RATING: 580 MWe CTOR AGE: 12.5 years DOR: Westinghouse HITECT-ENGINEERS: Stone and Webster RATORS: Connecticut Yankee Atomic Power Co.

ATION: 13 miles east of Meriden, Connecticut ATION: N/A T OPERATING CONDITION: Full power OF FAILURE: Inadequate performance; inadvertent operation OVERY METHOD: Operational event MENT: Actuation logic for the PORV and block valve has been modified from a one channel pressure signal to a 2 out of 3 channels to prevent spurious actuations.