Final ASP Analysis - Haddam Neck (LER 213-90-008)
ML20135G957
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/14/2020
From: Christopher Hunter
NRC/RES/DRA/PRB
To:
Littlejohn J (301) 415-0428
References
LER 213-1990-008
Download: ML20135G957 (4)


Text

B-40 valves (CH-SOV-242 and -242B) to correct previously identified single failure concerns.

The solenoid valves do not have independent control. They are deenergized to the closed position when their respective VCT suction isolation valves (CH-MOV-257 and CH MOV -257B) are closed. On a safety injection actuation signal the following automatic actions take place:

1. Both charging pumps start.

2. CH-MOV-257 and CH-MOV-257B close.
3. RWST suction isolation valves BA-MOV-32 and BA-MOV-373 open.

The charging pump suction vent line arrangement. is shown below.

ASP Modeling Assumptions and Approach Installation and later discovery of the leaking solenoid valves occurred during a single Figure removed during SUNSI review.