MONTHYEARML17275A2022017-09-29029 September 2017 End of Interval Relief Request Associated with the Third Ten-Year Inservice Inspection (ISI) Interval Project stage: Request ML17290B0092017-10-17017 October 2017 Acceptance Review: End of Interval Associated with the Third Ten-Year Inservice Inspection Interval Project stage: Acceptance Review ML17354A0182017-12-19019 December 2017 E-mail Request for Information (Rai): Relief Request I3R-23 Regarding Limited Examination Coverage Project stage: RAI ML18017A3762018-01-17017 January 2018 End of Interval Relief Request Associated with the Third Ten-Year Lnservice Inspection (ISI) Interval Project stage: Request ML18136A4142018-05-15015 May 2018 Relief Request (RR) I3R-23 to Request Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Project stage: Approval ML18144A2512018-05-24024 May 2018 Supplemental Information - End of Interval Relief Request Associated with the Third Ten-Year Inservice Inspection (ISI) Interval Project stage: Supplement ML18192C1722018-08-0707 August 2018 Relief for 13R-23 Third 10-Year Inservice Inspection Interval Project stage: Other 2018-01-17
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000352/20243012024-02-0202 February 2024 Initial Operator Licensing Examination Report 05000352/2024301 and 05000353/2024301 IR 05000352/20230042024-01-31031 January 2024 Integrated Inspection Report 05000352/2023004 and 05000353/2023004 IR 05000352/20240112024-01-31031 January 2024 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000352/2024011 ML24026A2962024-01-26026 January 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Syrs, . ML24004A0342024-01-17017 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0026 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000352/20230102024-01-11011 January 2024 Age-Related Degradation Report 05000352/2023010 and 05000353/2023010 IR 05000352/20234012023-12-21021 December 2023 Cybersecurity Inspection Report 05000352/2023401 and 05000353/2023401 ML23321A2362023-12-14014 December 2023 Issuance of Amendment Nos. 262 and 224 Adoption of TSTF-477, Revision 3 and Associated Technical Specification Changes ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23333A2182023-11-29029 November 2023 Operator Licensing Examination Approval ML23325A2062023-11-21021 November 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML23313A0432023-11-13013 November 2023 Summary of Regulatory Audit in Support of Amendment Request for Control Room Air Conditioning Technical Specifications ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000352/20230032023-10-27027 October 2023 Integrated Inspection Report 05000352/2023003 and 05000353/2023003 and Independent Spent Fuel Storage Installation Inspection 07200065/2023001 ML23297A1722023-10-24024 October 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000352/2024010 and 05000353/2024010 IR 05000352/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000352/2023501 and 05000353/2023501 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23276A5162023-10-0303 October 2023 Federal Emergency Management Agency Level 1 Finding from 2023 Evaluated Emergency Preparedness Exercise ML23275A1082023-09-29029 September 2023 FEMA Level 1 Findings Limerick NPP- Boyertown/Colebrookdale ML23241A9452023-09-27027 September 2023 Generation Station, Units 1 and 2 Regulatory Audit Plan Supporting Review of the Equipment Qualification Portion of Limerick Digital Instrumentation and Controls License Amendment Request ML23269A0522023-09-26026 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000352/2023010 and 05000353/2023010 ML23255A0952023-09-12012 September 2023 Resubmittal of License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) to Address ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A1002023-09-0606 September 2023 Requalification Program Inspection IR 05000352/20230052023-08-31031 August 2023 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2023005 and 05000353/2023005) ML23248A2082023-08-31031 August 2023 UFSAR Cover Page ML23242A2172023-08-30030 August 2023 Response to Request for Additional Information for Application to Adopt TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems and Associated Technical Specification Changes NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23228A0942023-08-16016 August 2023 Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the . IR 05000352/20230022023-08-14014 August 2023 Integrated Inspection Report 05000352/2023002 and 05000353/2023002 ML23220A0182023-08-0808 August 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000352/2023401 and 05000353/2023401 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor ML23212B2362023-07-31031 July 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System - WEC Documents ML23212B1052023-07-31031 July 2023 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise ML23202A2192023-07-21021 July 2023 Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the . ML23193B0122023-07-20020 July 2023 Audit Plan in Support of Review of License Amendment Request and Exemption Request for Digital Instrumentation and Controls Installation Support (Epids L-2023-LLA-0025 and L-2023-LLE-0005) ML23187A0962023-07-19019 July 2023 Generation Station, Unit Nos. 1 and 2 - Revised Estimated Review Completion Date Concerning License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML23208A1522023-07-0606 July 2023 PEMA Letter Dated 7-6-23 Re Limerick Exercise 9-26-23 ML23177A2242023-06-26026 June 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection . ML23145A1972023-06-23023 June 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 255, 256, 257, 258, 259, and 260 2024-02-02
[Table view] |
Text
Exelon Generation 200 Exelon Way Kennett Square. PA 19348 www exeloncorp com 10 CFR 50.55a May 24, 2018 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Limerick Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353
Subject:
Supplemental Information - End of Interval Relief Request Associated with the Third Ten-Year lnservice Inspection (ISi) Interval
References:
- 1) Letter from J. Barstow (Exelon Generation Company, LLC) to U.S.
Nuclear Regulatory Commission, "End of Interval Relief Request Associated with the Third Ten-Year lnservice Inspection (ISi) Interval,"
dated September 29, 2017
- 2) Email from V. Sreenivas (U.S. Nuclear Regulatory Commission) to T.
Loomis (Exelon Generation Company, LLC), "Limerick Units 1 and 2:
Request for Additional Information (RAI): Relief Request 13R-23 Regarding Limited Examination Coverage (EPID: L-2017-LLR-0098),"
dated December 19, 2017
- 3) Letter from J. Barstow (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "End of Interval Relief Request Associated with the Third Ten-Year lnservice Inspection (ISi) Interval," dated January 17, 2018
- 4) Email from V. Sreenivas (U.S. Nuclear Regulatory Commission) to T.
Loomis (Exelon Generation Company, LLC), "Limerick: Relief request (RR) 13R-23 to request relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), EPID: L-2017-LLR-0098," dated May 15, 2018 In the Reference 1 letter, in accordance with 10 CFR 50.55a, "Codes and standards,"
paragraph (g)(5)(iii), Exelon Generation Company, LLC (Exelon), requested relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV)
Code, Section XI, "Rules for lnservice Inspection of Nuclear Power Plant Components." This relief request applies to the third ten-year lnservice Inspection (ISi) interval, which concluded on January 31, 2017, for the Limerick Generating Station, Units 1 and 2. The third ten-year ISi interval complied with the ASME Boiler and Pressure Vessel Code, Section XI, 2001 Edition with 2003 Addenda.
Supplemental Information End of Interval Relief Requests May 24, 2018 Page 2 In the Reference 2 email, the U.S. Nuclear Regulatory Commission requested additional information. Reference 3 was our response to that email.
In the Reference 4 email, the U.S. Nuclear Regulatory Commission requested additional information regarding the Emergency Service Water (ESW) and Residual Heat Removal Service Water (RHRSW) system component supports. These component supports (Examination Category F-A, Item Number F1 .40) are for the ESW and RHRSW system pumps. Upon further review, Exelon is withdrawing the ESW and RHRSW pump supports from this request.
There are no regulatory commitments in this response.
If you have any questions concerning this response, please contact Tom Loomis at (61 O} 765-5510.
Respectfully, David P. Helker Manager - Licensing & Regulatory Affairs Exelon Generation Company, LLC cc: USNRC Region I, Regional Administrator USNRC Senior Resident Inspector, LGS USNRC Project Manager, LGS R. R. Janati, Pennsylvania Bureau of Radiation Protection