ML17221A380

From kanterella
Jump to navigation Jump to search
Spent Fuel Pit Coolant Piping Plan.
ML17221A380
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/08/1987
From:
EBASCO SERVICES, INC.
To:
FLORIDA POWER & LIGHT CO.
Shared Package
ML17221A382 List:
References
SK-83-02-M-002, SK-83-2-M-2, NUDOCS 8709110327
Download: ML17221A380 (1)


Text

10 12 13 14 15 16 17 18 19 3

8770-G-206 FH FH FH SI-I (n(-.~) FH 4 5. (0 I

3 2TL 4o 3i -/oo A 21L 0 MATCH LINE SFE DW6 8110 6 I12 (J-io) to "o ~.

RAA

~

oo Io PIPE SLEEVE ot 10"-FS-SIO EL. I(o' B Of Ut 45'OR vtJ t/t COMPONENT COOLANT 0 I '-CC- ISO IP oa A

I S'710 Ci ZOG C SH. 2 (N-5) av VOTES:

A,LL PIPING TO CONFORM TO EBASCO PIPING LINE Itt PIPE, SLCEVt LIST DRAWING 8110- B-052 tv SPEC. 81'70-FLO-H9 NO ALLOWANCE HAS BEEN MADE FOR WELDS OR GASKETS.

EL. B'- 0 I t UNLESS QTHERWISE NOTED:

ELBOWS TO BE LONG RADIUS AND INDICATED BY SHARP CORNERS; ALL PIPING 2 INCHES AND SMALLER, EXCEPT WHERE DIMENSIONED ON DRAWINGS TO BE FIELD RUN. D D FOR SMALL BRANCH PIPE CONNECTIONS, SEE IL 3 DESIGN GUIDES M4-20 AND M4-21 AND THE PIPING I 6899 (,INE LIST.

FIELD TO SET ALL PIPE SLEEVES IN CONCRETE 2LF5-o52I EL I '5-I BEFORE CONCRETE IS PLACED. SEE CONCRETE HYDRAULIC DRAWINGS FOR TYPICAL DETAILS OF 3 FS-520 CL.tEJ-I PIPE SLEEVES AND PIPE OPENINGS REQUIRING F 5 4 CL. IS" 0 SPECIAL FRAMING.

o al PIPING WILL NOT BE CUT FOR COLD SPRING.

0 0 SEE DESIGN GUIDE M11 1 t J o DESIGN AND LOCATION OP PIPF HANGERS FOR THE d SUPPORTrOF DEAD WEIGHT BY HANGER FABRICA-tao PiPC to PIPE %LEEVE I

l TOR.

SLEEVE 0 ANCHORS AND RESTRAINTS FOR SEISMIC PROTEC-LJt TION TO BE DESIGNED BY HANGER FABRICATOR AT THE LOCATIONS SHOWN ON THE EBASCO STRESS ANALYSIS 0 Io PIPE. SLCCVE (TYPJ 8770-G 20/o OPENINGS 8 INCHES IN DIAMETER AND LARGER, IN in il tatil (SII,ET(E - 5) GRATING AND CHECKERED PLATE FLOORS FOR SHO?

I/Iotpc tatev FABRICATED PIPING SHALL BE PROVIDED BY V- 4201 STRUCTURAL STEROL FABRICATOR. ALL OTHER F il 4 t F Bl t43- I I'atll il 0

OPENINGS IN GRATING AND CHECKERED FLOOR PLATES SHALL BE PROVIDED IN THE FIELD.

8'F'5-524 3 P5-524 KL i Bo I D ALL OPENINGS, EXCEPT THOSE FOR STRESS ANA-3 =~ 555 IE-FS 50I EL.'i(IL0 LYZED PIPELINES, SHALL CLEAR PIPE INSULA-aEL I t

I-3 TION BY A MINIMUM OF I INCH BEYOND EXTREMEi CI PILIGo- 8 .it-3 PIPE MOVEMENT.

EL. 5.

'Ilvl I

Io" OttPE CLE 4511 0 G-2 I" pipt lattvE VAl SH 2 tJ-SI RAC Pad MATCH LINE E tv to 9

9 9 U ol F PLAN BELOW EL. I9'-0 (A- 4) IS IS

,Y

'e El IEI 5-5 FOR CQI4T SEE DWG. 8110-G.I80 FH FH FOR CONT. SEE DWG. 8770-G-IISI FOR CONT. SEE. DWG. 8110-6-205 FH FH FH 4.EL. 2216 5 (s- is) (C" 2)

I /to 2 3 34'.0 4 2TLCto Bl -Go 2I -D .

aJ, I. 2'/2-CW- l78 L 20LO H,"

4 GAEL. GSLG RAA d o REFERENCE DRAWINGS, LI'ST OF DRAWINGS 8 l10-A-l46 STD 2/2" FIRE ai".SE CONN Lt liNITH SCREt CAto '

I IO FS 510 EL. 59 3 mwmi~og m ww IZ-CC 130 INSTRUMENT LIST -'IPE, VALVES 4 INSTRUMENT SYMBOLS PIPE LINE LIST ~ 81'TO-6-270 8110- 8-052 II 0 i. F ~+ ~

I CAPPED CONN.

I 0 " I= S - 5 0 I SalM P FUEL POOL HT. EXCHANGER VALVE 4 SPECIALTY LIST '

FUEL POOL SYSTEM P Fo 10 SPENT FUEL P IT COOLANT PJ Pl NG PLAIJ

~ I 10 - A -05 I 8l'TO- 8 I 87 70. Ci-20/tt 5H 1 (StPNOH aSt2K) 4 EL 23L 3 FOR COMPONENT COOLANT t

PIPING SEE DWG. 8110-G-180 I

8'/2 8'/2 '-IZS PS /2-FS 508 8 I10-G ZOEt SH.Z (H-5)

G'- I'/zo ELEC1 RACEWAY 14 PIPE. SLEEVE.

FUEL POOL SKIMMER t

4 )a2 ot 2" N K. 1

- FS 52I 7/f/N H/P///4 14K/a/lt SN 0 Vl I

2 0 a P

EL 40'to FS- 520 E~L40-7/I SEC'4 AIF/F//V%K@ PAAR% aa 0

0 Ta AFEZHcN NAJPEjt.

Q'a t 0: ttttv

/+z-/s('401 p

3"- FS 524

/ c/'m aL I

WP EL 37L2 IOxtS RED. PI I 0 IO 15 FT.

2/t V 4208 v 4209 44ttt ON ]

I

-Pt-5/o2 I-I tn FUEL POOL HIS -FS-SO2 .FS at v-4229 ta I/4 =I-0 Pt .2I TKE tats Ecc SLP3-52&

0. IFta -S ao tLEL.CI ECL I. F5-5al kiMt-5 $Q.

'l aaa

)4 SYPHON BREaaKE R V-4202 V-4205 5 t-4-IB V.4236 ?a.

-I

-IE I "VENT 433

/ IE'FS-50I 433 E FS-ttl RtitlOVttasLE 3'L BULKHEAD F5-524 SN 2 (E-5)

PL'J .

SPENT FUEL RACK KL 23'.ai'/

3" PIPE ROOF 5 SLEEVE EL 281 Et" 44I2 (TVP) APERTURE Pi'T LINER Dtacket g M, M LADDER~ mattattt) tF at /0 I I I ~3~ CARD O otat to t I F5-5(:- /8 Pr522 INWAV C REGULATIORY DOCKET FILE VENI tta F:P PUR 81 G 206 IT V4222. PUMP SH.Z (J-SI PZ +.

  • RAC taa FLORIDA POWER & LIGHT COMPANY Z 3-FS'555 EL EICOS~

an ST LUCIE PLANT ilaattavE PtPC 1978 890,000 KW INSTALLATIONUNIT NO. I I

-4 /4 tS 369 I5 18" SPENT FUEL PIT COOLANT PIPING 0 8 7 70- G -20G N

I I

I tU PLAN ABOVE EL. I9-0 SH. 2 (N-I2) PLAN aa EBASCO SERVICES INCORPORATED NEW YORK L-. SCALE I/4 jl 0 APPROVEO DATE Ply MECH. SI(.'- 55- QZ-DR F Pt362ahJ NO. DATE REVISION APPROVED CH M-QQZ ooopolc coNTIIOLo 10 12 13 -.14 Oooo.