ENS 54796

From kanterella
Jump to navigation Jump to search
ENS 54796 +/-
Where
Robinson Duke energy icon.png
South Carolina (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown
Time - Person (Reporting Time:+-0.15 h-0.00625 days <br />-8.928571e-4 weeks <br />-2.0547e-4 months <br />)
Opened: Kirk Schauer
12:42 Jul 21, 2020
NRC Officer: Ossy Font
Last Updated: Jul 21, 2020
54796 - NRC Website