ENS 53304
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
07:06 Mar 31, 2018 | |
Title | Secondary Containment Inoperable Due to Failed Surveillance Test |
Event Description | At 0206 [CDT] on March 31, 2018, with the plant in Mode 1 at 100% rated core thermal power, Grand Gulf Nuclear Station experienced a loss of Secondary Containment. During the performance of a Standby Gas Treatment System (SGTS) drawn down test with Auxiliary Building train bay door (1A319A) as the secondary containment boundary, Grand Gulf was unable to maintain secondary containment pressure, as required by SR [surveillance requirement] 3.6.4.1.4, greater than or equal to 0.266 inches of water vacuum for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Following initial vacuum draw down, secondary containment pressure degraded to 0.225 inches of water vacuum with operators in the field reporting air leakage from door 1A319A. The test was secured and Secondary Containment was declared inoperable and Technical Specification 3.6.1.4 A.1 was entered. Following completion of the failed surveillance test, Secondary Containment was returned to an operable status at 0315 hours0.00365 days <br />0.0875 hours <br />5.208333e-4 weeks <br />1.198575e-4 months <br /> on March 31, 2018, by returning the system to a previously known operable configuration by closing doors 1A310, 1A312 and 1A319. This is being report under 10 CFR 50.72(b)(3)(v)(C).
The licensee has notified the NRC Resident Inspector. |
Where | |
---|---|
Grand Gulf Mississippi (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material | |
Time - Person (Reporting Time:+2.9 h0.121 days <br />0.0173 weeks <br />0.00397 months <br />) | |
Opened: | Wesley Marshall 10:00 Mar 31, 2018 |
NRC Officer: | Howie Crouch |
Last Updated: | Mar 31, 2018 |
53304 - NRC Website | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |