ENS 52374

From kanterella
Jump to navigation Jump to search
ENS 52374 +/-
Where
Farley Southern Nuclear icon.png
Alabama (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown
Time - Person (Reporting Time:+-4.13 h-0.172 days <br />-0.0246 weeks <br />-0.00566 months <br />)
Opened: Chuck Barefield
20:51 Nov 17, 2016
NRC Officer: Donald Norwood
Last Updated: Nov 17, 2016
52374 - NRC Website