ENS 47986
ENS Event | |
---|---|
14:00 Jun 1, 2012 | |
Title | Cable Routing Error Could Fail Dc Control Power to Shutdown Board in a Fire |
Event Description | During NFPA 805 transition reviews, a cable routing error has been identified that would fail the DC control power to credited 4kV Shutdown Board 3EA for an Appendix R fire in Fire Area 23.
Cable 3B181 provides alternate DC Control Power to 4kV Shutdown Board 3EA from Battery Board 2. Cable 3B181 is routed in Fire Area 23. However, cable 3B181 is not identified as being in Fire Area 23 in Browns Ferry Nuclear Plant (BFN) calculation EDQ099920030037, Appendix R Computerized Separation Analysis. This error allowed the analysis to credit alternate DC Control Power to 4kV Shutdown Board 3EA. The normal DC Control Power to 4kV Shutdown Board 3EA is not available in the event of an Appendix R fire in Fire Area 23. The routing error results in the credited 4kV Shutdown Board 3EA being unable to perform its function for Fire Area 23 Appendix R fires due to both the associated normal and alternate DC Control Power cables being routed In Fire Area 23. The failure of 4kV Shutdown Board 3EA could result in a loss of power to credited safe shutdown equipment that would challenge the ability to provide adequate core cooling during performance of BFN Safe Shutdown Instructions. Compensatory actions in the form of fire watches to mitigate this condition are in place in accordance with the BFNP Fire Protection Report. This event is reportable as an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> notification to the NRC in accordance with 10CFR 50,72(b)(3)(ii)(B). This is also reportable as a 60 day written report in accordance with 10CFR 50.73(a)(2)(ii)(B). The licensee has notified the NRC Resident Inspector. |
Where | |
---|---|
Browns Ferry Alabama (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
Time - Person (Reporting Time:+3.43 h0.143 days <br />0.0204 weeks <br />0.0047 months <br />) | |
Opened: | Rodney Nacoste 17:26 Jun 1, 2012 |
NRC Officer: | John Knoke |
Last Updated: | Jun 1, 2012 |
47986 - NRC Website | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Unit 3 | |
---|---|
Reactor critical | Not Critical |
Scram | No |
Before | Cold Shutdown (0 %) |
After | Cold Shutdown (0 %) |
WEEKMONTHYEARENS 542662019-09-11T00:34:00011 September 2019 00:34:00
[Table view]10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Due to Lightning Strike ENS 533002018-03-29T18:44:00029 March 2018 18:44:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Due to Inoperability of Emergency Equipment Cooling Water Pump ENS 532672018-03-16T05:00:00016 March 2018 05:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Affecting Residual Heat Removal System ENS 530492017-11-01T19:25:0001 November 2017 19:25:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Design Deficiencies Identified During Engineering Review ENS 527072017-04-25T21:30:00025 April 2017 21:30:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Engineering Re-Evaluation of Tornado Impacts ENS 524522016-12-21T17:20:00021 December 2016 17:20:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition - 480V Bus Voltage Lower than Analyzed ENS 521502016-08-03T18:00:0003 August 2016 18:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Based on Review of National Fire Protection Association Requirements ENS 499542014-03-24T19:12:00024 March 2014 19:12:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Due to Postulated Fire-Induced Short ENS 498662014-03-02T22:30:0002 March 2014 22:30:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Discovered a Postulated Hot Short of a Cable During Extent of Condition Review ENS 496392013-12-16T23:00:00016 December 2013 23:00:00 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Potential for Spurious Start of Various Pumps During Postulated Fire Events ENS 494062013-10-03T20:35:0003 October 2013 20:35:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Inadequate Shift Staffing to Support Implementation of Safe Shutdown Instructions ENS 484672012-10-31T17:53:00031 October 2012 17:53:00 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Potentially Unable to Provide Power to Safe Shutdown Equipment During Appendix R Fire ENS 484212012-10-18T18:14:00018 October 2012 18:14:00 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Fire Protection Review Identifies a Potential Unanalyzed Condition ENS 480952012-07-11T20:20:00011 July 2012 20:20:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Cable Associated with 4Kv Shutdown Board Routed Incorrectly ENS 479862012-06-01T14:00:0001 June 2012 14:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Cable Routing Error Could Fail Dc Control Power to Shutdown Board in a Fire ENS 478342012-04-13T20:25:00013 April 2012 20:25:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Impacting Emergency Diesel Generator Loading ENS 477872012-03-29T22:00:00029 March 2012 22:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Impacting Appendix R Separation Requirements ENS 477842012-03-28T21:15:00028 March 2012 21:15:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Discovered During Nfpa 805 Transition Impacting Emergency Diesel Generator Loading ENS 476512012-02-08T19:35:0008 February 2012 19:35:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Scram Functionality May Be Degraded in a Appendix R Fire ENS 473742011-10-25T20:34:00025 October 2011 20:34:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Deficiency Identified in Transition to Performance Based Standard for Fire Protection ENS 476382010-05-11T06:00:00011 May 2010 06:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition ENS 487242009-07-28T06:00:00028 July 2009 06:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition That Could Have Resulted in an Increased Maximum Flood Level 2019-09-11T00:34:00 | |