ENS 47214
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
14:00 Aug 28, 2011 | |
Title | 24 Hour Notification of Pollution Discharge Permit Notification |
Event Description | On August 28, 2011 at approximately 1000 EDT the Indian Point common discharge canal was reported to be overflowing. The overflow condition was caused by the elevated river water levels experienced during Hurricane Irene. The site SPDES (State Pollution Discharge Elimination System) permit requires the canal discharge to be subsurface. Since the overflow was not a subsurface discharge it constituted a SPDES permit violation. There was no failure or malfunction of the outfall structure, and by 1430 EDT river level had lowered enough that the discharge canal was again operating within normal limits.
The resident inspector has been notified. New York State Department of Environment Control has been notified. |
Where | |
---|---|
Indian Point New York (NRC Region 1) | |
Reporting | |
Other Unspec Reqmnt | |
Time - Person (Reporting Time:+2.92 h0.122 days <br />0.0174 weeks <br />0.004 months <br />) | |
Opened: | John Dignam 16:55 Aug 28, 2011 |
NRC Officer: | Bill Huffman |
Last Updated: | Aug 28, 2011 |
47214 - NRC Website | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Unit 3 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 536012018-09-13T04:00:00013 September 2018 04:00:00
[Table view]Other Unspec Reqmnt Hurricane Notification Per Technical Requirement for Hurricane Florence ENS 509392015-03-30T16:00:00030 March 2015 16:00:00 Other Unspec Reqmnt Report to New York Public Service Commission Regarding Main Generator Voltage Regulator ENS 502582014-07-04T01:25:0004 July 2014 01:25:00 Other Unspec Reqmnt Hurricane within 500 Nautical Miles of the Facility ENS 472142011-08-28T14:00:00028 August 2011 14:00:00 Other Unspec Reqmnt 24 Hour Notification of Pollution Discharge Permit Notification ENS 472032011-08-26T20:30:00026 August 2011 20:30:00 Other Unspec Reqmnt Hurricane Notification Per Technical Requirements Manual ENS 462262010-09-02T22:00:0002 September 2010 22:00:00 Other Unspec Reqmnt Hurricane within 500 Nautical Miles of the Facility ENS 423652006-02-23T08:31:00023 February 2006 08:31:00 Other Unspec Reqmnt Accident Involving Transportation of Radioactive Material ENS 420412005-10-05T19:20:0005 October 2005 19:20:00 Other Unspec Reqmnt Tritium Detected in Transformer Yard Monitoring Well ENS 414032005-02-12T00:30:00012 February 2005 00:30:00 Other Unspec Reqmnt Notification to New York State Psc Involving Radwaste Shipment Incident Offsite ENS 409162004-08-03T15:30:0003 August 2004 15:30:00 Other Unspec Reqmnt Notification Made Due to Path of Hurricane Alex ENS 401662003-09-17T21:35:00017 September 2003 21:35:00 Other Unspec Reqmnt Hurricane Force Winds within 500 Nautical Miles of Plant 2018-09-13T04:00:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_47214&oldid=424413"